Permit: TC-COM-0625-01179
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
5005 S CAMPBELL AV
Address NEW:
5005 S CAMPBELL AV
Apply Date:
06/18/2025
Applicant:
Barbara Brown
Description:
REV1: changed the business name from Rollin Smoke to Bubbaque. The menu is similar, with the addition of a dedicated drink menu. The previously approved Kitchen 107 expansion has been replaced with a bar, requiring the relocation of the condiment and soda areas. The Order, Take-Out, and Expo locations have also been revised, along with associated millwork configurations. Additionally, a low wall has been added at the entry to improve circulation. Tenant Improvement of existing restaurant into Rollin Smokes BBQ
Permit Reviews
Permit Number - TC-COM-0625-01179
Permit Status: Complete
Permit Description: REV1: changed the business name from Rollin Smoke to Bubbaque. The
menu is similar, with the addition of a dedicated drink menu. The previously
approved Kitchen 107 expansion has been replaced with a bar, requiring the
relocation of the condiment and soda areas. The Order, Take-Out, and Expo
locations have also been revised, along with associated millwork configurations.
Additionally, a low wall has been added at the entry to improve circulation.
Tenant Improvement of existing restaurant into Rollin Smokes BBQ
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 02/13/2026 | APPROVED |
| 03/24/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/24/2026 | APPROVED |
| 09/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/05/2025 | APPROVED |
| 08/13/2025 | COMMERCIAL REVIEW - FULL v.2 | 09/02/2025 | APPROVED |
| 03/24/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/25/2026 | IN REVIEW |
| 09/02/2025 | RESTAMP - COMMERCIAL v.1 | 09/04/2025 | APPROVED |
| 06/20/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/14/2025 | REQUIRES RESUBMIT |
| 03/16/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/23/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0625-01179
Permit Status: Complete
Permit Description: REV1: changed the business name from Rollin Smoke to Bubbaque. The
menu is similar, with the addition of a dedicated drink menu. The previously
approved Kitchen 107 expansion has been replaced with a bar, requiring the
relocation of the condiment and soda areas. The Order, Take-Out, and Expo
locations have also been revised, along with associated millwork configurations.
Additionally, a low wall has been added at the entry to improve circulation.
Tenant Improvement of existing restaurant into Rollin Smokes BBQ
| Date | Description | Comments |
|---|---|---|
| 08/29/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 08/29/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/29/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 08/29/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 08/29/2025 | Masonry Inspection Report submittal review is required. | |
| 08/29/2025 | Post-Installed Anchor Inspection Report is required. | |
| 06/20/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/29/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 08/29/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 08/29/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01179
Permite Description: REV1: changed the business name from Rollin Smoke to Bubbaque. The
menu is similar, with the addition of a dedicated drink menu. The previously
approved Kitchen 107 expansion has been replaced with a bar, requiring the
relocation of the condiment and soda areas. The Order, Take-Out, and Expo
locations have also been revised, along with associated millwork configurations.
Additionally, a low wall has been added at the entry to improve circulation.
Tenant Improvement of existing restaurant into Rollin Smokes BBQ
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | 1/6/25: All rough plumbing approved. Revision will be submitted for review. Ok to backfill at risk. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01179
Permit Description: REV1: changed the business name from Rollin Smoke to Bubbaque. The
menu is similar, with the addition of a dedicated drink menu. The previously
approved Kitchen 107 expansion has been replaced with a bar, requiring the
relocation of the condiment and soda areas. The Order, Take-Out, and Expo
locations have also been revised, along with associated millwork configurations.
Additionally, a low wall has been added at the entry to improve circulation.
Tenant Improvement of existing restaurant into Rollin Smokes BBQ
Total Completed Inspections - 26
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | COT - HCBU - Masonry Pregrout | Passed | 1/5/26: Work completed prior to inspections. Please be sure to submit third party inspection report to file. | |
| 01/16/2026 | COT - HCPL - Gas Pressure Test | Passed | 1-16-26: gas pressure test approved. | |
| 01/16/2026 | COT - HCPL - Rough Soil | Passed | 1-16-26: approved. | |
| 01/23/2026 | COT - HCBU - Framing | Passed | Pony wall at Order area (105). Stage framing at 109. Approved. 1/23/2026 |
|
| 01/23/2026 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 02/18/2026 | COT - BULD - SWG Clearance | Passed | 2-18-26: gas pressure test previously approved. However, contractor placed the whole system under test at 5 psi-okay for SWG to install new meter. Clearance issued. | |
| 02/24/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | All dining areas approved. Okay to proceed progress areas. 2/24/2026 | |
| 02/24/2026 | COT - HCEL - Electrical Above Ceiling | Passed | All dining areas approved. Okay to proceed progress areas. 2/24/2026 | |
| 03/09/2026 | COT - FCON - Alarm - Final | Passed | ||
| 03/09/2026 | COT - FCON - Fire - Final | Passed | ||
| 03/09/2026 | ENGR Engineering Final | Passed | ||
| 03/09/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/09/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 03/09/2026 | COT - FCON - Hood System - Final | Passed | ||
| 03/09/2026 | COT - HCBU - Building Above Ceiling | Passed | 3-9-26: approved. | |
| 03/09/2026 | COT - HCME - Kitchen Hood | Passed | 3-9-26: approved. | |
| 03/09/2026 | COT - HCBU - Roof Nailing | Passed | 3-9-26: approved. | |
| 03/09/2026 | COT - HCEL - Electrical Intermediate | Passed | 3-9-26: electrical intermediate approved. | |
| 03/09/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 3-9-26: mechanical above ceiling approved. | |
| 03/09/2026 | COT - HCME - Mechanical Intermediate | Passed | 3-9-26: mechanical intermediate approved. | |
| 03/09/2026 | COT - HCPL - Plumbing Intermediate | Passed | 3-9-26: plumbing intermediate approved. | |
| 03/10/2026 | COT - HCBU - Building Final | Passed | 3-10-26: building final approved. | |
| 03/10/2026 | COT - HCEL - Electrical Final | Passed | 3-10-26: electrical final approved. | |
| 03/10/2026 | COT - HCME - Mechanical Final | Passed | 3-10-26: mechanical final approved. | |
| 03/10/2026 | COT - HCPL - Gas Final | Passed | 3-10-26: gas final approved. | |
| 03/10/2026 | COT - HCPL - Plumbing Final | Passed | 3-10-26: plumbing final approved. |