Permit: TC-COM-0625-01179

Parcel: 140122150


Addresses:

5005 S CAMPBELL AV

Inspection Status: Re-inspection required

Inspection History: COT - HCPL - Plumbing Intermediate 

Date Description Inspector Results Comments
01/07/2026 COT - HCPL - Plumbing Intermediate  Re-inspection required 1-7-26: reschedule pour back when dowels are in place.
01/16/2026 COT - HCPL - Plumbing Intermediate  Partial Pass 1-16-26: in wall DWV/ domestic verified under test. Okay to continue with TI at progress areas.
02/18/2026 COT - HCPL - Plumbing Intermediate  Partial Pass 2-18-26: gas pressure test previously approved. However, contractor placed the whole system under test at 5 psi-okay for SWG to install new meter. Clearance issued.
03/09/2026 COT - HCPL - Plumbing Intermediate  Passed 3-9-26: plumbing intermediate approved.