Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1588 E 1ST ST
Address NEW:
1588 E 1ST ST
Apply Date:
06/12/2025
Applicant:
Brandy Burke
Description:
Addition of two exterior exiting stairways to existing sleeping area. One on the east side and one on the west side

Permit Reviews

Permit Number - TC-COM-0625-01147
Permit Status: Complete
Permit Description: Addition of two exterior exiting stairways to existing sleeping area. One on the east side and one on the west side
Start Date Submittal Complete Date Status  
08/06/2025 COMMERCIAL REVIEW - FULL v.3 08/12/2025 REQUIRES RESUBMIT Review Details
08/22/2025 COMMERCIAL REVIEW - FULL v.4 08/26/2025 APPROVED Review Details
10/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/15/2025 APPROVED Review Details
07/16/2025 COMMERCIAL REVIEW - FULL v.2 08/05/2025 REQUIRES RESUBMIT Review Details
06/12/2025 COMMERCIAL REVIEW - FULL v.1 07/07/2025 REQUIRES RESUBMIT Review Details
08/26/2025 RESTAMP - COMMERCIAL v.1 09/09/2025 APPROVED Review Details
10/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/20/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0625-01147
Permit Status: Complete
Permit Description: Addition of two exterior exiting stairways to existing sleeping area. One on the east side and one on the west side
Date Description Comments
08/11/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/09/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/11/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/11/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
08/11/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/30/2025 IBC 1004.5.1 allows the increased occupant load of the Sleeping Room. The occupant load of the Sleeping Room stating "Not to exceed 40 Occupants", along with a specific egress path diagram signage in the Sleeping Room to align with the specific egress path on the floor plan.
08/11/2025 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
08/11/2025 Masonry Inspection Report submittal review is required.
08/11/2025 Post-Installed Anchor Inspection Report is required.
06/12/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/11/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/11/2025 SPECIAL INSPECTION FOR COLD-FORMED STEEL DECK IS REQUIRED
08/11/2025 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0625-01147
Permit Description: Addition of two exterior exiting stairways to existing sleeping area. One on the east side and one on the west side
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/15/2025 COT - FCON - Fire - Final Passed
10/10/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
10/10/2025 COT - HCBU - Framing Passed
10/10/2025 COT - HCBU - Masonry Pregrout Passed
10/10/2025 COT - HCBU - Preslab Passed
10/10/2025 COT - HCBU - Roof Nailing Passed
10/10/2025 COT - HCBU - Stem Wall/Retaining Wall Passed
10/10/2025 COT - HCEL - Electrical Above Ceiling Passed
10/10/2025 COT - HCEL - Electrical Final Passed
10/10/2025 COT - HCPL - Plumbing Above Ceiling Passed
10/10/2025 COT - HCEL - Electrical Intermediate Passed
10/15/2025 COT - FCON - Alarm - Final Passed
10/10/2025 COT - LCBU - Building Final Passed
10/15/2025 ENGR Engineering Final Passed
10/14/2025 TRSP - ROW - Final/Close-Out Passed
10/15/2025 COT - FCON - Sprinkler - Final Passed
10/10/2025 COT - HCBU - Building Above Ceiling Passed
10/10/2025 COT - LCEL - Outdoor Lighting Passed
10/10/2025 COT - HCBU - Building Final Passed
10/10/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
10/10/2025 COT - HCPL - Plumbing Final Passed
10/10/2025 COT - HCPL - Plumbing Intermediate Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
OCCUPANCY LOAD - CONDITION MET 10.17.25_V1.PDF DOCUMENTS VIEW
RJDGSIGNED25-063M SIGMA KAPPA STAIRS SP IN FINAL-2025-10-13_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
25-063M SIGMA KAPPA SP IN FRM INITIAL-2025-08-06_V2.PDF DOCUMENTS VIEW
25051 SIGMA KAPPA STAIRS CALC PACKAGE_V1.PDF DOCUMENTS VIEW
COT COMMENT REV SIGKAPSTAIRS V4_V1.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT 2002_V2.PDF DOCUMENTS VIEW