Permit: TC-COM-0623-01468
Permit Details
Apply Date:
06/09/2023
Applicant:
Zachary Hollifield
Description:
New Office and Warehouse/40-Truck Dock.
Permit Reviews
Permit Number - TC-COM-0623-01468
Permit Status: Inspections
Permit Description: New Office and Warehouse/40-Truck Dock.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/15/2024 | RESTAMP - COMMERCIAL v.1 | 08/16/2024 | APPROVED |
11/22/2023 | COMMERCIAL REVIEW - FULL v.3 | 12/20/2023 | REQUIRES RESUBMIT |
06/09/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/30/2023 | REQUIRES RESUBMIT |
02/22/2024 | COMMERCIAL REVIEW - FULL v.5 | 03/21/2024 | REQUIRES RESUBMIT |
09/19/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/13/2023 | REQUIRES RESUBMIT |
07/15/2024 | COMMERCIAL REVIEW - FULL v.6 | 08/15/2024 | APPROVED |
01/17/2024 | COMMERCIAL REVIEW - FULL v.4 | 02/09/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0623-01468
Permit Status: Inspections
Permit Description: New Office and Warehouse/40-Truck Dock.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
02/06/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
02/06/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
02/06/2024 | Masonry Inspection Report submittal review is required. |
02/06/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Conditions
Permit Number - TC-COM-0623-01468
Permit Status: Inspections
Permit Description: New Office and Warehouse/40-Truck Dock.
Date | Description | Comments |
---|---|---|
06/09/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0623-01468
Permite Description: New Office and Warehouse/40-Truck Dock.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Room numbers #112, #110, #109, #108. Underground plumbing per plan an under test. Okay to backfill progress areas. Shading required. 10/9/2024 Pre-con for sub starting sewer line on-site. 10/14/2024 10/22/24: 6"SDR PVC from Manhole on west side of property to first manhole south west of office area. Pending air test and continuation of sewer pipe. Ok to backfill progress area. |
10/18/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 10/18/24: 6" SDR-35 PVC 100' run running east from first manhole west side of project. Ok to backfill at risk. Pressure test required. |
11/08/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Partial pass. 1/0 UFER in place and secured to the rebar. 11/8/2024 |
11/18/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Canceled per contractor. 10/8/2024 Grid line #6 - #14 on B. From B to B.6 footers and reinforcements per plans okay for concrete placement. 10/9/2024 From B.6 to C. Grid line #14 - #4. Footers and reinforcements per plan. Okay for concrete placement. 10/11/2024 Grid line A. #1-#4. D #4-#1. A-D office side. Okay for concrete placement. 10/15/2024 10/18/24: reinforcement per plan at stem wall and piers at GL B-C/12-14 10/23/24: reinforcement per plan at stem wall and piers at GL C 11-6. 10/29/24: reinforcement per plan at stem wall and piers GL C/ 6-2 11/7/24: reinforcement per plan at stem wall and piers GL A/3.5-4.5, D/2.5-3.1, C-D/3.1, C/3.1/4.5 11/8/2024 reinforcement per plan at stem all footings. D/1-2.5, 1/A-D, A/1-3.1, 3.1/A-A.5. okay for concrete placement in progress areas. 11/12/24: reinforcement per plan at stem wall at GL A-D/1-3 11/18/24: reinforcement per plan at warehouse slab ok to proceed. |
12/09/2024 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 11/4/24: electrical underground stub-outs from building at south west corner of building for CT-cabinet, secondary, outside lighting, generator, transformer switch, ok to proceed 11/13/24: not ready 12/9/24: electrical underground for TEP 4" PVC schedule 40 conduit 400' run south of building. |