Permit: TC-COM-0526-00785
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
7655 S HOUGHTON RD
Address NEW:
7655 S HOUGHTON RD
Apply Date:
05/29/2026
Applicant:
Melanie Bagley
Description:
New paint and auto body repair facility.
Permit Reviews
Permit Number - TC-COM-0526-00785
Permit Status: In review
Permit Description: New paint and auto body repair facility.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/03/2026 | COMMERCIAL REVIEW - FULL v.1 | 06/25/2026 | REQUIRES RESUBMIT |
| 07/29/2026 | COMMERCIAL REVIEW - FULL v.2 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-COM-0526-00785
Permit Status: In review
Permit Description: New paint and auto body repair facility.
Total Outstanding Activity Conditions - 11
| Date | Name |
|---|---|
| 06/03/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 06/03/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 06/15/2026 | SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. |
| 06/15/2026 | SPECIAL INSPECTION OF METAL BUILDING SYSTEMS IS REQUIRED. |
| 06/15/2026 | SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED. |
| 06/15/2026 | SPECIAL INSPECTION OF SOILS IS REQUIRED. |
| 06/15/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 06/15/2026 | SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED. |
| 06/24/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed sand/oil interceptor. |
| 06/25/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 06/25/2026 | WATER STERILIZATION REPORT IS REQUIRED. |