Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
05/19/2026
Applicant:
Dan Buker
Description:
Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 5. All files are in the permit for Building 4: TC-COM-0226-00202

Permit Reviews

Permit Number - TC-COM-0526-00732
Permit Status: Inspections
Permit Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 5. All files are in the permit for Building 4: TC-COM-0226-00202
Start Date Submittal Complete Date Status  
05/19/2026 COMMERCIAL REVIEW - FULL v.1 06/03/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0526-00732
Permit Status: Inspections
Permit Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 5. All files are in the permit for Building 4: TC-COM-0226-00202
Date Description Comments
05/19/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0526-00732
Permite Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 5. All files are in the permit for Building 4: TC-COM-0226-00202
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
06/10/2026 COT - HCBU - TCO N/A Not Ready
06/18/2026 BULD - Electrical Clearance N/A Not Applicable
06/18/2026 COT - BULD - SWG Clearance N/A Not Applicable
ENGR Engineering Final N/A Scheduled
08/17/2026 COT - LCEL - Electrical Final N/A Partial Pass 8/17/2026 Partial pass. Building 5 units
211,210,209,208,207,206,205,204,203,202,201,200. Approved.
08/03/2026 COT - LCME - Mechanical Final N/A Not Ready Building 5.
Unit 109. Remove door from closet with sub panel. Complete panel schedule at sub panel. Add receptacle due to spacing over 12’. Coat hanger shall be at 48”. Mirror shall be at 40” to the reflective side. Ensure all flush valves are on the open side at all ADA bathrooms. Unit 100 missing receptacle near door entry. Lav greater than 34” coat hanger shall be at 48”. Mirror shall be at 40” Receptacle near kitchen counter shall be GFCI protected. Remove pan head screws from sub panel covers.
08/03/2026 COT - LCBU - Building Final N/A Not Ready Building 5.
Unit 109. Remove door from closet with sub panel. Complete panel schedule at sub panel. Add receptacle due to spacing over 12’. Coat hanger shall be at 48”. Mirror shall be at 40” to the reflective side. Ensure all flush valves are on the open side at all ADA bathrooms. Unit 100 missing receptacle near door entry. Lav greater than 34” coat hanger shall be at 48”. Mirror shall be at 40” Receptacle near kitchen counter shall be GFCI protected. Remove pan head screws from sub panel covers.
08/03/2026 COT - LCPL - Plumbing Final N/A Not Ready Building 5.
Unit 109. Remove door from closet with sub panel. Complete panel schedule at sub panel. Add receptacle due to spacing over 12’. Coat hanger shall be at 48”. Mirror shall be at 40” to the reflective side. Ensure all flush valves are on the open side at all ADA bathrooms. Unit 100 missing receptacle near door entry. Lav greater than 34” coat hanger shall be at 48”. Mirror shall be at 40” Receptacle near kitchen counter shall be GFCI protected. Remove pan head screws from sub panel covers.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0526-00732
Permit Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 5. All files are in the permit for Building 4: TC-COM-0226-00202
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/18/2026 TRSP - ROW - Final/Close-Out Passed all work completed on private property verified with the contractor TCOmpassing for right away final for temporary CFO
08/03/2026 COT - FCON - Alarm - Final Passed I already have completed this inspection.
08/03/2026 COT - FCON - Fire - Final Passed I already have completed this inspection.
08/03/2026 COT - FCON - Sprinkler - Final Passed I already have completed this inspection.

Scheduled Inspections

Scheduled Inspections - TC-COM-0526-00732
Status: Inspections
Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 5. All files are in the permit for Building 4: TC-COM-0226-00202
Scheduled Date Description Entered By Entered Date
08/18/2026 COT - LCBU - Building Final Scheduled
08/18/2026 COT - LCPL - Plumbing Final Scheduled
08/18/2026 ENGR Engineering Final Scheduled
08/18/2026 COT - LCME - Mechanical Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW