Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2026 | ENGR Engineering Final | Not Ready | Contractor is trying to obtain TCO for buildings 4,5,6 and 7 to rent out apartments and the main building for a leasing office. All equipment, materials storage and work/construction areas need to be fenced off or otherwise physically separated from public and the buildings listed above. Both entrances from street need to remain open and not obstructed by this fencing. Reschedule when ready. |
|
| 08/03/2026 | ENGR Engineering Final | Not Ready | Provide accessible parking plan | |
| 08/18/2026 | ENGR Engineering Final | Passed |