Permit: TC-COM-0525-01005
Permit Details
Status:
In Revision
Type:
Commercial Building
Address:
5651 S HOUGHTON RD
Address NEW:
5651 S HOUGHTON RD
Apply Date:
05/15/2025
Applicant:
Dave Damitio
Description:
New McDonald's building
Permit Reviews
Permit Number - TC-COM-0525-01005
Permit Status: In revision
Permit Description: New McDonald's building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2025 | COMMERCIAL REVIEW - FULL v.3 | 09/18/2025 | APPROVED |
| 02/03/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | N/A | IN REVIEW |
| 09/22/2025 | ADMINISTRATIVE v.1 | 09/22/2025 | REQUIRES RESUBMIT |
| 09/18/2025 | RESTAMP - COMMERCIAL v.1 | 09/22/2025 | APPROVED |
| 05/16/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/20/2025 | REQUIRES RESUBMIT |
| 07/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 08/15/2025 | REQUIRES RESUBMIT |
| 12/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/26/2025 | APPROVED |
| 10/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0525-01005
Permit Status: In revision
Permit Description: New McDonald's building
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/31/2025 | Prior to project being finalized applicant must provide recorded documents for the water and electrical easements shown to be recorded under separate instruments on sheet SP1 of TD-DEV-0525-00132 |
| 08/07/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
| 09/10/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/10/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 09/10/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
Conditions
Permit Number - TC-COM-0525-01005
Permit Status: In revision
Permit Description: New McDonald's building
| Date | Description | Comments |
|---|---|---|
| 05/16/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 05/16/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/07/2025 | An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf | |
| 09/10/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: TC-COM-0525-01005
Permite Description: New McDonald's building
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2025 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 12.12.25 Partial for ufer only |
| 12/15/2025 | zzzPDSD Building Division - Site Excavation/Layout/Rebar | N/A | Not Ready | |
| 12/18/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | |
| 01/06/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | underslab |
| 01/09/2026 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Electrical underground inspection. All branch circuits in kitchen areas ran to the main distributing panel and other miscellaneous equipment. Okay to backfill progress areas in pad. 1/9/2026 |
| 01/17/2026 | COT - HCPL - Sewer | N/A | Re-inspection required | 1/16/26: Missing Clean out per C500 detail 2, two-way clean out not per plans at 2" connection to building per detail 6, 2" vent for grease trap must have tracer wire attached to plumbing underground. Corrections must be made prior to backfill. |
| COT - LCPL - Yard Water Line | N/A | Requested | ||
| COT - HCBU - Exterior Clips/Sheathing | N/A | Scheduled | ||
| 02/04/2026 | COT - HCBU - Roof Nailing | N/A | Canceled | Pre-slab has not passed. |
| 01/17/2026 | COT - HCBU - Preslab | N/A | Re-inspection required | 1/16/26: continuous #5 rebar missing at slab per detail S2.3 with additional #4x32" long dowels at 16" o.c at doors, all columns base must be coated with asphaltic paint below grade, holdowns missing at all shear-walls per approved plans, reinforcement not in place around freezer pad per detail S2.7 (missing 2#6 continuous around pad), will need to verify (3) 2x10 redwood sleepers at freezer pad, Recessed slab for mop sinks missing per approved plans at two locations, vapor barrier was never inspected. |
| COT - HCBU - Framing | N/A | Scheduled |
Completed Inspections
Permit Status: In Revision
Permit Number: TC-COM-0525-01005
Permit Description: New McDonald's building
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2025 | BULD - Electrical Clearance | Passed | 12.4.25 Approved for temp power |
|
| 12/04/2025 | COT - HCEL - Electrical Underground | Passed | 12.4.25 Conduit type and depth from panel to transformer verified and approved |
|
| 12/11/2025 | COT - HCEL - Electrical Progress | Passed | 12.4.25 Proceed Ok to backfill progress areas |
|
| 12/12/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Approved to pour | |
| 02/05/2026 | COT - HCPL - Yard Water Line | Passed |
Scheduled Inspections
Scheduled Inspections - TC-COM-0525-01005
Status: In Revision
Description: New McDonald's building
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 02/06/2026 | COT - HCBU - Roof Nailing | Scheduled | |
| 02/06/2026 | COT - HCBU - Preslab | Scheduled | |
| 02/06/2026 | COT - HCBU - Exterior Clips/Sheathing | Scheduled | |
| 02/06/2026 | COT - HCBU - Framing | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.