Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: TC-COM-0525-01005
Parcel: 141019160

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL REVISION v.1

Permit Number - TC-COM-0525-01005
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/05/2026 Commercial Building Standard APPROVED Structural (S) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/4/2026

Building (B) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/4/2026
02/05/2026 Commercial Mechanical Standard APPROVED Mechanical (M) Reviewer
Jorge Valido; jvalido@safebuilt.com
Discipline Status:Approved with Comments
Date Completed: 2/5/2026
No Mechanical in this Revision.
02/05/2026 Commercial Plumbing Standard APPROVED Plumbing (P) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/4/2026
02/10/2026 Outdoor Lighting Standard APPROVED
02/24/2026 Water - PDSD Standard APPROVED
02/25/2026 Site Zoning Standard NOT REQUIRED
02/25/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/05/2026 Commercial Electrical Standard REQUIRES RESUBMIT Electrical (E) Reviewer
Ron Ross; rross@safebuilt.com
Discipline Status:Denied
Date Completed: 2/3/2026
ES1.2: Need to provide a Tucson City Outdoor Lighting Code Ordinance exterior lumens per acre calculation to show
continued compliance as the new design has added a couple of extra fixtures.
02/25/2026 Site Engineering Standard REQUIRES RESUBMIT Site Engineering Review

TC-COM-0525-01005
5651 S HOUGHTON RD

Description: New McDonald's building

Site Engineering comments are as follows:

1. This commercial building permit cannot be approved until the revision to the associated development package, TD-DEV-0525-00132, is approved by all reviewers. UDC Article 3.3.3.7.a.
2. Ensure that the permit submittals match. Re-submit this permit once the above-mentioned DP is approved by all reviewers.

To re-submit, visit the Tucson Development Center Online at:
https://tdc-online.tucsonaz.gov/#/home

The instructions for resubmittal can be found at: Revisions and Resubmittals

Engineering Associate: Ryan Insalaco
ryan.insalaco@tucsonaz.gov
02/25/2026 Fire New Construction Standard REVIEW COMPLETED
02/03/2026 PDSD Application Completeness Express REVIEW COMPLETED