Permit Details

Status:
Complete
Type:
Commercial Building
Address:
8500 S RITA RD
Address NEW:
8500 S RITA RD
Apply Date:
05/23/2023
Applicant:
Brandy Burke
Description:
Manufacturing Fit-Up. Intent to apply for annual facilities permit once CofO is issued.

Permit Reviews

Permit Number - TC-COM-0523-01370
Permit Status: Complete
Permit Description: Manufacturing Fit-Up. Intent to apply for annual facilities permit once CofO is issued.
Start Date Submittal Complete Date Status  
11/15/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/17/2023 APPROVED Review Details
06/13/2023 RESTAMP - COMMERCIAL v.1 06/20/2023 APPROVED Review Details
09/27/2023 COMMERCIAL REVIEW - FULL v.1 10/27/2023 REQUIRES RESUBMIT Review Details
06/12/2023 COMMERCIAL REVIEW - FULL v.2 06/13/2023 APPROVED Review Details
11/02/2023 COMMERCIAL REVIEW - FULL v.2 11/09/2023 APPROVED Review Details
11/30/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/04/2023 APPROVED Review Details
05/25/2023 COMMERCIAL REVIEW - FULL v.1 06/08/2023 REQUIRES RESUBMIT Review Details
11/09/2023 RESTAMP - COMMERCIAL v.1 11/14/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0523-01370
Permit Status: Complete
Permit Description: Manufacturing Fit-Up. Intent to apply for annual facilities permit once CofO is issued.
Date Description Comments
11/01/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
11/09/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/17/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/09/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
11/17/2023 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/17/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/01/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01370
Permite Description: Manufacturing Fit-Up. Intent to apply for annual facilities permit once CofO is issued.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
09/19/2023 COT - HCBU - Framing N/A Partial Pass Screen room.
09/19/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass Screen room.
10/23/2023 COT - BULD - SWG Clearance N/A Not Applicable
08/31/2023 COT - HCPL - Rough Soil N/A Partial Pass
10/27/2023 BULD - Electrical Clearance N/A Not Applicable
COT - FCON - Alarm - Final N/A Not Ready need alarm company to call in their permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01370
Permit Description: Manufacturing Fit-Up. Intent to apply for annual facilities permit once CofO is issued.
Total Completed Inspections - 17
Date Description Inspector Results Comments
08/11/2023 COT - HCBU - Preslab Passed
09/14/2023 COT - HCPL - Plumbing Intermediate Passed Wash out room.
09/25/2023 COT - HCBU - Framing Passed Office area.
9/25/23: screen room and break room, all framing and rough electric approved.
09/25/2023 COT - HCEL - Electrical Intermediate Passed Office area.
9/25/23: screen room and break room, all framing and rough electric approved.
10/10/2023 COT - LCME - Mechanical Final Passed
10/10/2023 COT - HCME - Mechanical Intermediate Passed
10/23/2023 COT - LCEL - Electrical Final Passed 10/23/23: Level 1 TCO furniture/stock (no public)
10/23/2023 COT - FCON - Sprinkler - Final Passed
10/27/2023 COT - HCPL - Rough Soil Passed 8/23/23: new floor sink in Dark Room and new soil line for water fountain outside restrooms.

Sewer tie in.

9/6/23: 3 new hand sinks in break room on south end of building.

10/26/23: Not ready for inspection of new soil lines.

10/27/23: new soil lines in Dark Room approved to cover
10/31/2023 COT - LCPL - Plumbing Final Passed
11/07/2023 COT - FCON - Alarm - Final Passed
11/07/2023 COT - FCON - Fire - Final Passed
11/14/2023 COT - LCBU - Building Progress Passed
11/14/2023 COT - LCEL - Electrical Progress Passed
11/14/2023 COT - LCPL - Plumbing Progress Passed
12/01/2023 COT - LCME - Mechanical Progress Passed
12/01/2023 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
CONS-09568.000_PLAN SET_V2.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CHROME HEARTS MANUFACTURING FIT-UP - REPORT FINAL_V1.PDF DOCUMENTS VIEW
23-063M CHROME HEARTS, SP. IN. CERT. FINAL-2023-11-14_V1.PDF DOCUMENTS VIEW
CATALINA MECH. - CHROME HEARTS MANUFACTURING LAB RESULTS-2023-11-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-09568.000_ADDENDUM 01_FULL SET_REV1_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
09568.000_PLUMBING FIXTURE CUTSHEET PACKAGE_V2.PDF DOCUMENTS VIEW
CONS-09568.000_PLAN SET_V2.PDF DOCUMENTS VIEW
09568.000_EXIT LIGHTING CUT SHEET_X1,X2_V2.PDF DOCUMENTS VIEW
09568.000_LIGHTING CUT SHEET_M1,M2,M3_V2.PDF DOCUMENTS VIEW
09568.000_RESPONSE LETTERS_V1.PDF DOCUMENTS VIEW
09568.000_SUPPORT LETTER_V1.PDF DOCUMENTS VIEW
09568.000_EQUIPMENT LIST - CUT SHEET PACKAGE_V2.PDF DOCUMENTS VIEW
09568.000_HAZARDOUS MATERIALS MANAGEMENT PLAN - INVENTORY_V1.PDF DOCUMENTS VIEW
09568.000_STRUCTURAL CALCS_V2.PDF DOCUMENTS VIEW