Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0523-01370
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/01/2023 | Site Zoning | APPROVED | |||
| 05/31/2023 | Site Engineering | NOT REQUIRED | |||
| 06/08/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/31/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0523-01370 GENERAL: ⦁ Provide written responses to all review comments. ⦁ Provide a complete plan set. ⦁ Provide additional documents as requested by review staff. Structural(S) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/31/2023 1:47:20 PM 1. Sheet A1.5/A1.6: Provide additional information regarding the storage racks. Provide all structural information for the steel storage racks in accordance with 2018 IBC Section 2209. Additionally, provide any information regarding high piled storage in accordance with 2018 IBC Section 413.1. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/31/2023 1:31:23 PM 1. Sheet G1.0: The general building summary provides multiple occupancy types within structure. However, there is no indication as to the separation strategy being used. Provide clarification if a separated mix use or non-separated mix use strategy is being used and correlate all applicable requirements in accordance with 2018 IBC Section 508. 2. Sheet G1.0: The general building summary does not provide the allowable/actual area as well as the building height/stories. Provide the allowable/actual area and the height/stories information.\ 3. Sheet G1.2: Sheet G1.0 indicates that there is both and A-2 and A-3 use group present, however, the A-3 use group is not indicated on Sheet G1.2. Provide clarification and corelate all applicable pages. 4. General: Provide a detailed narrative regarding the operations of the F-2 and H-4 occupancy group. The narrative should include the following: What is being manufactured, standard manufacturing processes, chemicals being used in the process, quantities of the chemicals being used and stored, all other pertinent information. 5. Sheet G1.2: Provide a detail scope of work for the area indicated on this sheet. 6. Sheet A1.5/A1.6: Provide additional information regarding the storage racks. Provide all structural information for the steel storage racks in accordance with 2018 IBC Section 2209. Additionally, provide any information regarding high piled storage in accordance with 2018 IBC Section 413.1. Mechanical(M) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/31/2023 1:44:02 PM 1. Provide updated ventilation and air balances schedules. Electrical(E) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/31/2023 1:47:06 PM Plumbing(P) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/31/2023 1:45:35 PM |
||
| 05/30/2023 | Fire New Construction | REQUIRES RESUBMIT | -Indicate if fire alarm is existing, being installed, required/not required. -Include hazardous material management plan (HMMP) and hazardous materials inventory statement (HMIS). See IFC appendix H for requirements. -If top of storage/shelves is greater than 12' (high piled combustible storage), provide a fire sprinkler analysis. john.vincent@tucsonaz.gov 5203495581 |
||
| 05/25/2023 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 06/08/2023 | Water - PDSD | REVIEW COMPLETED |