Permit: TC-COM-0423-00958
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
7070 E TANQUE VERDE RD
Address NEW:
7070 E TANQUE VERDE RD
Apply Date:
04/05/2023
Applicant:
Alexis Alvarez
Description:
New Photovoltaic System on Steel Stand Alone Structure 183 Modules INSTALL (2) SOLAR CARPORTS INSTALL (1) TRANSFORMER INSTALL WALL-MOUNTED PV EQUIPMENT INSTALL (9) CARPORT MOUNTED LIGHTS
Permit Reviews
Permit Number - TC-COM-0423-00958
Permit Status: Complete
Permit Description: New Photovoltaic System on Steel Stand Alone Structure 183 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (9) CARPORT MOUNTED LIGHTS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | APPROVED |
| 07/17/2023 | COMMERCIAL REVIEW - FULL v.2 | 08/07/2023 | REQUIRES RESUBMIT |
| 11/12/2024 | RESTAMP - COMMERCIAL v.1 | 11/12/2024 | APPROVED |
| 10/17/2024 | COMMERCIAL REVIEW - FULL v.3 | 11/12/2024 | APPROVED |
| 08/28/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/28/2024 | REQUIRES RESUBMIT |
| 11/06/2023 | COMMERCIAL REVIEW - FULL v.3 | 12/04/2023 | APPROVED |
| 04/13/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/15/2023 | REQUIRES RESUBMIT |
| 11/27/2024 | COMMERCIAL REVIEW - FULL REVISION v.1 | 12/10/2024 | APPROVED |
| 05/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/07/2025 | APPROVED |
| 04/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/25/2025 | REQUIRES RESUBMIT |
| 08/30/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/16/2024 | REQUIRES RESUBMIT |
| 12/04/2023 | RESTAMP - COMMERCIAL v.1 | 12/05/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0423-00958
Permit Status: Complete
Permit Description: New Photovoltaic System on Steel Stand Alone Structure 183 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (9) CARPORT MOUNTED LIGHTS
| Date | Description | Comments |
|---|---|---|
| 11/12/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 09/26/2024 | SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED.(Foundation Reinforcing and Anchor Bolts) | |
| 12/04/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/12/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 11/12/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 11/12/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00958
Permite Description: New Photovoltaic System on Steel Stand Alone Structure 183 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (9) CARPORT MOUNTED LIGHTS
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | COT - CSOL - Electrical Progress Solar Project | N/A | Not Applicable | |
| 11/21/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Verbal Clearance for TEP DGL. (Line side tap). 11/21/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00958
Permit Description: New Photovoltaic System on Steel Stand Alone Structure 183 Modules
INSTALL (2) SOLAR CARPORTS
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (9) CARPORT MOUNTED LIGHTS
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Approved (6) column pier foundations and Ufer ground, okay for concrete placement | |
| 02/11/2025 | COT - CSOL - Electrical Underground Solar Project | Passed | Approved underground from equipment location to solar structure, okay to backfill progress areas | |
| 02/25/2025 | COT - CSOL - Electrical Final Solar Project | Passed | Approved solar structure - DGC Clearance to TEP is required for the solar meter | |
| 02/25/2025 | COT - LCBU - Building Final | Passed | Approved solar structure - DGC Clearance to TEP is required for the solar meter | |
| 02/25/2025 | ENGR Engineering Final | Passed | ||
| 02/25/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 02/25/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 02/25/2025 | SITE - Zoning Final | Passed | ||
| 02/25/2025 | COT - CSOL - Outdoor Lighting Solar Project | Passed | ||
| 02/25/2025 | BULD - Electrical Clearance | Passed | Approved solar structure - DGC Clearance to TEP is required for the solar meter |