Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0423-00958
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/12/2023 | Commercial Structural | APPROVED | |||
| 05/15/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/15/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical review comments and provide a written response. 1 Provide full compliance with the 2012 City of Tucson Outdoor Lighting Code for the new Canopy lighting. 2 Provide for local disconnecting means at the structure for the canopy lighting as required per NEC art 225.31-32. 3 Indicate the method in detail how the PV output supply side interconnection is going to be accomplished without compromising the listing of the service equipment. A field evaluation may be necessary by a NRTL agency to re-certify the listing of the equipment after the Tap is completed. 4 Verify that the DG Disconnect (PV Utility Disconnect) is rated as suitable for use as service equipment per NEC 690. 13(C). 5 provide a complete grounding detail for the steel canopy grounding including a grounding electrode system at the canopy structures per NEC 690.47. 6 Indicate fuse ratings in the DC (Utility Disconnect). Ref; 2018 IBC section 107.2.1, 2017 NEC, 2012 City of Tucson Outdoor Lighting Code. |
||
| 05/01/2023 | Site Engineering | REQUIRES RESUBMIT | 1. The approved development package, DP22-0090, only shows the southern carport. The northern carport is not included. Remove the northern carport from the COM plans or submit a revision of the development package that includes the northern carport. Lianne Evans lianne.evans@tucsonaz.gov |
||
| 05/03/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-0423-00958 7070 E TANQUE VERDE RD Zoning C-1 TRANSMITTAL DATE:May 3, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: After reviewing the approved development package,(DP22-0090) it shows the southern carport only. Remove the northern carport from the COM plans or submit a revision of the development package that includes the northern carport. Additional comments may be forthcoming. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
| 04/14/2023 | Fire New Construction | REVIEW COMPLETED | |||