Inspection Status: Re-inspection required

Inspection History: COT - HCBU - Building Progress

Date Description Inspector Results Comments
09/26/2025 COT - HCBU - Building Progress Re-inspection required 9-26-25: add shot pins 12" o.c. at sill and shot pins at top track-see schedule for details.
10/13/2025 COT - HCBU - Building Progress Partial Pass Sheet rock nailing in Southeast portion of structure.
10/30/2025 COT - HCBU - Building Progress Partial Pass 10/30/25 framing per plan, ok to proceed in suite
11/03/2025 COT - HCBU - Building Progress Partial Pass 11-3-25: drywall nailing inspection approved on East side of demising wall. Okay for tape & texture at progress areas.
11/13/2025 COT - HCBU - Building Progress Partial Pass 11-13-25: drywall nailing approved-pending drywall nailing inspection at restrooms.
11/17/2025 COT - HCBU - Building Progress Re-inspection required 11-17-25: replace screws in bathroom wet locations with anti corrosion screws such as stainless steel or zinc coated.
12/01/2025 COT - HCBU - Building Progress Partial Pass 12-1-25: partial pass on demising wall separating Suite 110 & 140. Obtain clarification from architect on whether bracing is required. Okay to drywall one side up 3' below roof deck.
12/09/2025 COT - HCBU - Building Progress Partial Pass 12-9-25: okay to tape & texture half of north wall of Suite 110. Schedule drywall screw inspection on other half.
Note: okay to tape top demising wall at Suite 140.
12/10/2025 COT - HCBU - Building Progress Partial Pass 12/10/2025 screw inspection for demising wall heading east approved. West wall at top of wall approved.
12/11/2025 COT - HCBU - Building Progress Not Ready 12-11-25: missing section of drywall.
12/12/2025 COT - HCBU - Building Progress Not Ready 12/12/2025 no one on site at the time of inspection.
12/16/2025 COT - HCBU - Building Progress Partial Pass 12-16-25: framing at suite 110 demising wall approved. Okay to drywall
12/17/2025 COT - HCBU - Building Progress Passed 12-17-25: drywall nailing approved-okay to tape/texture.