Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1530 W VALENCIA RD
Apply Date:
02/02/2026
Applicant:
Harold Farnsworth
Description:
Interior alteration of an existing Arbys to convert to Angies REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval

Permit Reviews

Permit Number - TC-COM-0226-00148
Permit Status: Complete
Permit Description: Interior alteration of an existing Arbys to convert to Angies REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
Start Date Submittal Complete Date Status  
03/20/2026 SPECIAL INSPECTION REVIEW v.1 03/25/2026 APPROVED Review Details
05/07/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/08/2026 APPROVED Review Details
03/20/2026 ADMINISTRATIVE v.1 03/20/2026 REQUIRES RESUBMIT Review Details
05/08/2026 COMMERCIAL REVIEW - FULL REVISION v.1 05/26/2026 REQUIRES RESUBMIT Review Details
05/28/2026 COMMERCIAL REVIEW - FULL REVISION v.2 05/29/2026 APPROVED Review Details
05/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/07/2026 APPROVED Review Details
02/05/2026 COMMERCIAL REVIEW - FULL v.1 02/23/2026 REQUIRES RESUBMIT Review Details
02/26/2026 COMMERCIAL REVIEW - FULL v.2 03/20/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0226-00148
Permit Status: Complete
Permit Description: Interior alteration of an existing Arbys to convert to Angies REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
Date Description Comments
03/20/2026 AIR BALANCING REPORT (INCLUDING HOOD PERFORMANCE TESTING) IS REQUIRED.
02/05/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/19/2026 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
03/19/2026 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
02/05/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/20/2026 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0226-00148
Permite Description: Interior alteration of an existing Arbys to convert to Angies REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/04/2026 BULD - Electrical Clearance N/A Not Applicable 5-4-26: not applicable.
05/06/2026 COT - LCPL - Rough Soil N/A Not Applicable 5-6-26: not applicable.
05/06/2026 COT - LCBU - Building Final N/A Partial Pass 5-6-26: pending kitchen hood inspection & existing conditions, pending plumbing "as built" letter from architect regarding use of existing floor drains and an RFI for electrical schedule & elimination of an existing panel.
Note: once electrical RFI is reviewed & approved, we will re-inspect panels.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0226-00148
Permit Description: Interior alteration of an existing Arbys to convert to Angies REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
Total Completed Inspections - 14
Date Description Inspector Results Comments
04/29/2026 COT - LCBU - Framing Passed 4-29-26: framing approved.
04/29/2026 COT - LCPL - Gas Pressure Test Passed 4-29-26: gas pressure test verified at 15 psi.
05/04/2026 COT - BULD - SWG Clearance Passed 5-4-26: okay to meter-SWG clearance issued.
05/04/2026 COT - LCEL - Electrical Above Ceiling Passed 5-4-26: approved.
05/04/2026 COT - LCME - Mechanical Intermediate Passed 5-4-26: approved.
05/05/2026 COT - FCON - Hood System - Final Passed
05/06/2026 COT - FCON - Fire - Final Passed
05/06/2026 COT - LCPL - Plumbing Intermediate Passed 5-6-26: approved.
05/06/2026 COT - LCEL - Electrical Intermediate Passed 5-6-26: approved.
05/27/2026 COT - HCBU - TCO Passed
06/15/2026 COT - LCME - Mechanical Final Passed 6-15-26: mechanical final approved.
06/24/2026 COT - LCBU - Building Final Passed 6-24-26: building final approved. Okay to apply for a C of O.
06/24/2026 COT - LCEL - Electrical Final Passed 6-24-26: electrical final approved.
06/24/2026 COT - LCPL - Plumbing Final Passed 6-24-26: plumbing final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-TC-COM-0226-00148 REVISED SHEETS P101 AND P201_V1.PDF DOCUMENTS VIEW
ELECTRICAL ENGINEER_LETTER AND PANEL SCHEDULES_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
ANGIE'S VALENCIA - TAB REPORT_V1.PDF DOCUMENTS VIEW
FINAL REPORT NC2604-022 AFFORDABLE COMMERCIAL CONSTRUCTION-2026-05-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-20260130 PERMIT SUBMITTAL_V2.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE_1-9-14 (1)-2026-02-23_V2.PDF DOCUMENTS VIEW