Permit: TC-COM-0226-00148
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1530 W VALENCIA RD
Address NEW:
1530 W VALENCIA RD
Apply Date:
02/02/2026
Applicant:
Harold Farnsworth
Description:
Interior alteration of an existing Arbys to convert to Angies REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
Permit Reviews
Permit Number - TC-COM-0226-00148
Permit Status: Complete
Permit Description: Interior alteration of an existing Arbys to convert to Angies
REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/25/2026 | APPROVED |
| 05/07/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/08/2026 | APPROVED |
| 03/20/2026 | ADMINISTRATIVE v.1 | 03/20/2026 | REQUIRES RESUBMIT |
| 05/08/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 05/26/2026 | REQUIRES RESUBMIT |
| 05/28/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 05/29/2026 | APPROVED |
| 05/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/07/2026 | APPROVED |
| 02/05/2026 | COMMERCIAL REVIEW - FULL v.1 | 02/23/2026 | REQUIRES RESUBMIT |
| 02/26/2026 | COMMERCIAL REVIEW - FULL v.2 | 03/20/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0226-00148
Permit Status: Complete
Permit Description: Interior alteration of an existing Arbys to convert to Angies
REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
| Date | Description | Comments |
|---|---|---|
| 03/20/2026 | AIR BALANCING REPORT (INCLUDING HOOD PERFORMANCE TESTING) IS REQUIRED. | |
| 02/05/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/19/2026 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 03/19/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 02/05/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/20/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0226-00148
Permite Description: Interior alteration of an existing Arbys to convert to Angies
REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2026 | BULD - Electrical Clearance | N/A | Not Applicable | 5-4-26: not applicable. |
| 05/06/2026 | COT - LCPL - Rough Soil | N/A | Not Applicable | 5-6-26: not applicable. |
| 05/06/2026 | COT - LCBU - Building Final | N/A | Partial Pass | 5-6-26: pending kitchen hood inspection & existing conditions, pending plumbing "as built" letter from architect regarding use of existing floor drains and an RFI for electrical schedule & elimination of an existing panel. Note: once electrical RFI is reviewed & approved, we will re-inspect panels. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0226-00148
Permit Description: Interior alteration of an existing Arbys to convert to Angies
REV1: Plumbing / Existing Floor Drains An updated RFI will be submitted documenting the approved use of the existing floor drains and existing DWV/domestic piping systems. 2. Electrical Revisions / Panel D Elimination An updated RFI and revised electrical drawings will be submitted documenting the elimination of Panel D from the project scope. Updated electrical panel schedules and revised load calculations reflecting the final installed configuration are being prepared by the Engineer of Record. 3. MC Cable Support Clarification Field installation of MC cable support and securement is being reviewed to confirm compliance with NEC 330.30(A), including confirmation that bundled MC cables are properly listed and identified for support and securement requirements. 4. Final Electrical Labeling All junction boxes above accessible ceilings and electrical disconnects will be verified and labeled as required prior to final approval
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2026 | COT - LCBU - Framing | Passed | 4-29-26: framing approved. | |
| 04/29/2026 | COT - LCPL - Gas Pressure Test | Passed | 4-29-26: gas pressure test verified at 15 psi. | |
| 05/04/2026 | COT - BULD - SWG Clearance | Passed | 5-4-26: okay to meter-SWG clearance issued. | |
| 05/04/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 5-4-26: approved. | |
| 05/04/2026 | COT - LCME - Mechanical Intermediate | Passed | 5-4-26: approved. | |
| 05/05/2026 | COT - FCON - Hood System - Final | Passed | ||
| 05/06/2026 | COT - FCON - Fire - Final | Passed | ||
| 05/06/2026 | COT - LCPL - Plumbing Intermediate | Passed | 5-6-26: approved. | |
| 05/06/2026 | COT - LCEL - Electrical Intermediate | Passed | 5-6-26: approved. | |
| 05/27/2026 | COT - HCBU - TCO | Passed | ||
| 06/15/2026 | COT - LCME - Mechanical Final | Passed | 6-15-26: mechanical final approved. | |
| 06/24/2026 | COT - LCBU - Building Final | Passed | 6-24-26: building final approved. Okay to apply for a C of O. | |
| 06/24/2026 | COT - LCEL - Electrical Final | Passed | 6-24-26: electrical final approved. | |
| 06/24/2026 | COT - LCPL - Plumbing Final | Passed | 6-24-26: plumbing final approved. |