Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCEL - Electrical Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2026 | COT - LCEL - Electrical Intermediate | Re-inspection required | 4-24-26: Firefoam all penetrations at top plates and have architect/engineer of record submit an updated RFI addressing the exclusion of Panel D. | |
| 04/29/2026 | COT - LCEL - Electrical Intermediate | Re-inspection required | 4-29-26: have engineer/architect submit the RFI showing elimination of Panel D. Provide updated electrical panel schedules together with load calculations. No more than 3 Mc cables are allowed to be zip-tied together, however, they must be listed & identified for securement and support per NEC 330.30A. Note: at finals-we will be verifying that all junction boxes above ceiling & disconnects are labeled. |
|
| 05/04/2026 | COT - LCEL - Electrical Intermediate | Re-inspection required | 5-4-26: see previous notes. | |
| 05/06/2026 | COT - LCEL - Electrical Intermediate | Passed | 5-6-26: approved. |