Permit: TC-COM-0224-00294
Permit Details
Apply Date:
02/12/2024
Applicant:
Ric Espiriti
Description:
Detached Storage Building
Permit Reviews
Permit Number - TC-COM-0224-00294
Permit Status: Complete
Permit Description: Detached Storage Building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/03/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/07/2024 | REQUIRES RESUBMIT |
| 02/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/06/2025 | APPROVED |
| 06/17/2024 | RESTAMP - COMMERCIAL v.1 | 06/18/2024 | APPROVED |
| 07/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2024 | APPROVED |
| 06/13/2024 | COMMERCIAL REVIEW - FULL v.3 | 06/17/2024 | APPROVED |
| 02/13/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/20/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0224-00294
Permit Status: Complete
Permit Description: Detached Storage Building
| Date | Description | Comments |
|---|---|---|
| 03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 03/15/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 03/15/2024 | Provide Metal Building Drawings marked For Construction as a deferred submittal Designs must be submitted and approved prior to Building Final Inspections | |
| 03/20/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00294
Permite Description: Detached Storage Building
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2024 | BULD - Electrical Clearance | N/A | Not Ready | |
| 08/15/2024 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | |
| 09/20/2024 | COT - LCEL - Electrical Progress | N/A | Partial Pass | 9/20/24: partial for electrical above ceiling. Rough-in for lighting |
| 10/17/2024 | COT - LCEL - Electrical Final | N/A | Re-inspection required | J boxes need cover plates throughout, along with labeling and k.o seals. Two lighting fixtures east end of building not working. Provide covers at gutter box. 10/17/2024 |
| COT - FCON - Alarm - Final | N/A | Not Ready | Will need Sprinkler Monitoring Permit and System installed. | |
| 10/17/2024 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | Missing grab bars in bathroom. Lower mirror to proper height along with other fixtures to meet ADA requirements. Pex lines need to be secured throughout building and insulated. Provide protection to pex line where in contact with metal. Provide 18" of copper at main water line, from first sweat fitting to pex line. Provide sterilization report prior to finals. |
| 10/17/2024 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 10/17/2024 | COT - LCBU - Building Final | N/A | Not Ready | |
| 12/20/2024 | ENGR Engineering Final | N/A | Not Ready | No bike racks |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00294
Permit Description: Detached Storage Building
Total Completed Inspections - 22