Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0224-00270
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
6175 S MIDVALE PARK RD BLDG 2
Address NEW:
6175 S MIDVALE PARK RD BLDG 2
Apply Date:
02/08/2024
Applicant:
Carlos Navarro
Description:
BLDG B SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Permit Reviews
Permit Number - TC-COM-0224-00270
Permit Status: Inspections
Permit Description: BLDG B SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/11/2024 | COMMERCIAL REVIEW - FULL v.4 | 07/11/2024 | APPROVED |
| 02/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | REQUIRES RESUBMIT |
| 06/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 07/08/2024 | REQUIRES RESUBMIT |
| 04/09/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/08/2024 | REQUIRES RESUBMIT |
| 02/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/18/2024 | REQUIRES RESUBMIT |
| 10/31/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/26/2024 | APPROVED |
| 02/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0224-00270
Permit Status: Inspections
Permit Description: BLDG B SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 07/01/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 07/01/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
| 07/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/01/2024 | Post-Tension Inspection Report is required. |
| 07/01/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0224-00270
Permit Status: Inspections
Permit Description: BLDG B SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Date | Description | Comments |
|---|---|---|
| 02/08/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 02/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/11/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0124-00025 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 02/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/01/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0224-00270
Permite Description: BLDG B SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 10/22/24: electrical underground at building b and clubhouse per plans ok to proceed. |
| 04/03/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | 4-3-25, nailing for building 2 decking approved. Okay to continue with construction |
| 11/25/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok to backfill Riser Stub outs for Buildings A, B, C, and D. |
| 05/15/2025 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 5-15-25, interior shear wall inspection for Building B, floor level interior & exterior walls inspected. Also verified were shot pins, anchor bolts, HTT4's. Exterior sheathing on far west side of clubhouse needs nails throughout. This area together with missing anchor bolts at marked locations will be checked on next inspection. Okay to continue with construction at progress areas. |
| 05/20/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 5-20-25, partial pass for 2nd level exterior/interior nailing on shear walls, shot pins, & hardware on Building 2 verified. Okay to continue with construction at progress areas. Note: nailing for sheathing on the Clubhouse's western wall together with missing anchor bolts for exterior walls requires re-inspection. Also, any added nails to correct "called out" nailing on sheathing while performing an inspection will be verified at a re-inspection. |
| 07/29/2025 | COT - HCPL - Yard Water Line | N/A | Partial Pass | 7/29/25: partial pass for 20' run of water line from meter location to building |
| 07/31/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 7.31.2025: Balcony intermediate both floors approved, okay to continue progress areas. |
| 08/28/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 8/28/25: plumbing in wall per approved plans. Over notched studs require repair. |
| 08/28/2025 | COT - HCME - Mechanical Intermediate | N/A | Not Ready | |
| 07/31/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 7.31.2025: Balcony intermediate both floors approved, okay to continue progress areas. |
| 09/16/2025 | COT - HCME - Mechanical Above Ceiling | N/A | Re-inspection required | 9-16-25: provide any photos of all items which were previously notated that required corrections. Otherwise, "spot checks" (cutting of drywall will be required) at each corner unit will be required to verify firefoam compliance at chutes/between Boca plates at kitchen exhausts. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0224-00270
Permit Description: BLDG B SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2024 | COT - HCBU - Preslab | Passed | 11/21/24: not ready 11/25/24: partial pass for west half. East half is missing 6 hold downs per plan. 12/3/24L corrections made ok to proceed |
|
| 05/14/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 09/15/2025 | COT - HCBU - Building Above Ceiling | Passed | 9-15-25: above ceiling MEP's at clubhouse approved. | |
| 11/19/2025 | BULD - Electrical Clearance | Passed | 11/19/25: TEP ECO FOR 6175BS MIDVALE PARK RD (EV1 AND EV2) |