Inspection Status: Partial Pass
Inspection History: COT - HCBU - Interior Shear BracingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 05/15/2025 |
COT - HCBU - Interior Shear BracingĀ |
|
Partial Pass |
5-15-25, interior shear wall inspection for Building B, floor level interior & exterior walls inspected. Also verified were shot pins, anchor bolts, HTT4's. Exterior sheathing on far west side of clubhouse needs nails throughout. This area together with missing anchor bolts at marked locations will be checked on next inspection. Okay to continue with construction at progress areas. |