Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - HCPL - Plumbing Final 

Permit Number - TC-COM-0224-00270

Inspection Description - COT - HCPL - Plumbing Final 

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/16/2026 COT - HCPL - Plumbing Final  Re-inspection required 1-16-26: accessible toilet restroom at clubhouse-missing electrical/light switch covers, seal around water closet, lower mirror to 40" to reflective surface, janitor closet-wrap water heater hot side, install mop sink plumbing controls, tele/data room-update panel schedule, install lockout/shackle for water heater at panel, accessible toilet room 2- lower mirror to 40: to reflective surface, lower soap dispenser to 48" o.c., siding knee guards missing at kitchen island, missing cover plate next to exit sign at south end, install backsplash at kitchen sink to meet ADA reach requirements, install missing cap on hvac units, missing condensate drain on hvac units, seal penetrations at mechanical closet, lock out required at breaker for Water heater and air handlers,label disconnects at condensers, 3" clearance required around condensers (clean around condensers), seal around conduit northside of clubhouse, missing light fixtures under soffit at clubhouse main entrance.
01/21/2026 COT - HCPL - Plumbing Final  Partial Pass 1/21/26: corrections made at clubhouse (units have not been walked)
01/27/2026 COT - HCPL - Plumbing Final  Partial Pass 1/27/26: Final inspections conducted for building 2 units 2101,2101,2103,2104,2201,2202,2203,2204. 2104( seal penetration through vapor barrier at mechanical room, secure microwave in cabinet, exhaust at dryer must be properly attached), 2203( leak at kitchen sink and secure fresh air in mechanical room). OKAY FOR LEVEL 3 FOR CLUB HOUSE ONLY.
01/29/2026 COT - HCPL - Plumbing Final  Passed 1-29-26: Building 2-plumbing final approved.