Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
3233 E SPEEDWAY BL
Apply Date:
02/06/2024
Applicant:
Dave Loew
Description:
Connection of 2 existing buildings with new building (lobby, concessions & restrooms), elevator for ADA access to the existing second floor, new outdoor cinema, new enclosed movie screen.

Permit Reviews

Permit Number - TC-COM-0224-00249
Permit Status: Issued
Permit Description: Connection of 2 existing buildings with new building (lobby, concessions & restrooms), elevator for ADA access to the existing second floor, new outdoor cinema, new enclosed movie screen.
Start Date Submittal Complete Date Status  
08/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/22/2025 APPROVED Review Details
05/06/2024 COMMERCIAL REVIEW - FULL v.3 06/06/2024 REQUIRES RESUBMIT Review Details
09/13/2024 COMMERCIAL REVIEW - FULL v.1 11/07/2024 REQUIRES RESUBMIT Review Details
07/22/2025 COMMERCIAL REVIEW - FULL REVISION v.1 08/07/2025 APPROVED Review Details
02/07/2024 COMMERCIAL REVIEW - FULL v.1 03/06/2024 REQUIRES RESUBMIT Review Details
06/18/2024 COMMERCIAL REVIEW - FULL v.4 06/25/2024 REQUIRES RESUBMIT Review Details
06/26/2024 COMMERCIAL REVIEW - FULL v.5 06/26/2024 APPROVED Review Details
05/03/2024 COMMERCIAL REVIEW - FULL v.2 05/03/2024 REQUIRES RESUBMIT Review Details
06/26/2024 RESTAMP - COMMERCIAL v.1 06/27/2024 APPROVED Review Details
08/19/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/20/2025 REQUIRES RESUBMIT Review Details
08/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/22/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0224-00249
Permit Status: Issued
Permit Description: Connection of 2 existing buildings with new building (lobby, concessions & restrooms), elevator for ADA access to the existing second floor, new outdoor cinema, new enclosed movie screen.
Total Outstanding Activity Conditions - 13
Date Name
02/27/2024 ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
02/27/2024 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.
02/27/2024 Please submit a separate sign permit for an signs associated with this projet.
02/27/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
02/27/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
02/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
02/27/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.
03/05/2024 AIR BALANCING REPORT IS REQUIRED.
06/21/2024 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.
06/21/2024 SPECIAL INSPECTION FOR Epoxy/Expansion/or Post Installed ANCHORS IS REQUIRED.
06/21/2024 SPECIAL INSPECTION FOR Geotechnical/Earthwork IS REQUIRED
06/21/2024 SPECIAL INSPECTION FOR STEEL CONSRUCTION IS REQUIRED.
06/26/2024 Elevator Designs must be submitted and approved prior to ...

Conditions

Permit Number - TC-COM-0224-00249
Permit Status: Issued
Permit Description: Connection of 2 existing buildings with new building (lobby, concessions & restrooms), elevator for ADA access to the existing second floor, new outdoor cinema, new enclosed movie screen.
Date Description Comments
02/07/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/27/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
06/25/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0224-00249
Permite Description: Connection of 2 existing buildings with new building (lobby, concessions & restrooms), elevator for ADA access to the existing second floor, new outdoor cinema, new enclosed movie screen.
Total Outstanding Inspections - 19
Last Inspection Date Description Inspector Results Comments
07/22/2024 TRSP - ROW - Final/Close-Out N/A Re-inspection required
10/29/2024 COT - HCEL - Electrical Underground N/A Partial Pass Conduits up from slab to level #1 and level #2; data lines and to first level panels. Ok to cover progress areas.
04/02/2025 COT - LCBU - Roof Nailing N/A Partial Pass Ok to,dry-in roof system of Building #4.
04/14/2025 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass concessions and restrooms
03/19/2025 COT - LCBU - Framing N/A Partial Pass Roof nailing, shear nailing, and property line fire-wall for Theater Four.
01/24/2025 COT - HCEL - Electrical Progress N/A Partial Pass Secondary off the transformer.
08/11/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass New theater area at levels #1 & 2. Corridors and rooms for possible TCO.
10/18/2024 COT - LCBU - Masonry Pregrout N/A Partial Pass Elevator shaft at 4 feet: OK to place grout in progress areas.
08/19/2025 COT - HCEL - Electrical Above Ceiling N/A Partial Pass New concessions area, second level, projector room, two restrooms.
06/11/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass Mechanical above hard lid ceilings in Box Office and women,s restroom. Ok to cover progress areas.
08/22/2025 COT - HCBU - TCO N/A Partial Pass 8/22/25: Ok for tco level 4 for the snack bar area and restrooms only.
08/21/2025 COT - FCON - Fire - Final N/A Partial Pass Ok for tco level 4 for the snack bar area and restrooms only.
10/14/2024 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass elevator footing
08/22/2025 COT - LCME - Mechanical Final N/A Partial Pass 8/22/25: Ok for tco level 4 for the snack bar area and restrooms only.
08/22/2025 COT - LCPL - Plumbing Final N/A Partial Pass 8/22/25: Ok for tco level 4 for the snack bar area and restrooms only.
08/22/2025 ENGR Engineering Final N/A Partial Pass Bathrooms and lobby okay for Level 4 TCO
08/11/2025 COT - LCME - Mechanical Intermediate N/A Partial Pass New theater area at levels 1 & 2 corridors and rooms for future TCO.
08/22/2025 COT - LCBU - Building Final N/A Partial Pass 8/22/25: Ok for tco level 4 for the snack bar area and restrooms only.
08/11/2025 COT - LCPL - Plumbing Intermediate N/A Partial Pass New theater area levels 1 & 2 corridors and rooms for future TCO.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0224-00249
Permit Description: Connection of 2 existing buildings with new building (lobby, concessions & restrooms), elevator for ADA access to the existing second floor, new outdoor cinema, new enclosed movie screen.
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/14/2024 COT - LCBU - Stem Wall/Retaining Wall Passed
10/24/2024 COT - LCPL - Rough Soil Passed Ok to cover and compact progress areas.
11/06/2024 COT - LCBU - Preslab Passed
02/13/2025 COT - HCEL - Electrical Underground Passed
03/04/2025 BULD - Electrical Clearance Passed
04/14/2025 COT - HCBU - Roof Nailing Passed Concession building approved. Okay to apply roofing system. 4/14/2025
04/14/2025 PDSD Building Division Pre-Construction Meeting Passed
05/23/2025 COT - LCPL - Plumbing Roof Drains Passed Approved. Roof drains secured in place and on test. 5/23/2025
08/22/2025 COT - BULD - SWG Clearance Passed

Documents

File Name Document Type  
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
25G0822_1 TURNER 07 31 2025 1414-2025-08-22_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
ELEVATOR DEFERRED SUBMITTAL W ARCH. APPROVAL (REV. 8.21.25)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOFT SCREEN WALL CALCS_V1.PDF DOCUMENTS VIEW
REVISION DRAWING_OUTDOOR CINEMA NE SCREEN WALL_V1.PDF DOCUMENTS VIEW
REVISION NARRATIVES 6.26.2025_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
THE LOFT CINEMA REMODELING AND NEW TWO STORY EXPANSION_V1.PDF DOCUMENTS VIEW