Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Framing
Permit Number - TC-COM-0224-00249
Inspection Description - COT - LCBU - Framing
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2025 | COT - LCBU - Framing | Partial Pass | Roof nailing, shear nailing, and property line fire-wall for Theater Four. | |
| 04/02/2025 | COT - LCBU - Framing | Partial Pass | This inspection is for exterior sheathing and clips for Building #4. OK to cover exterior walls. | |
| 04/11/2025 | COT - LCBU - Framing | Not Ready | Wanted shear and roof in concessions and restrooms. | |
| 05/12/2025 | COT - LCBU - Framing | Partial Pass | Level #1, Concession/entry area; Ok to insulate and sheet rock up to,Level #2. | |
| 05/23/2025 | COT - LCBU - Framing | Partial Pass | Partial pass. Room 202 & 203 under furred out floor approved. Okay to proceed progress areas. 5/23/2025 | |
| 06/03/2025 | COT - LCBU - Framing | Partial Pass | Level # 2, projection room and ADA restroom. Ok to,insulate and cover walls. | |
| 06/26/2025 | COT - LCBU - Framing | Partial Pass | 6-26-25: verified fire caulking at the midway point of the elevator shaft. 0kay to continue with construction at progress areas. |