Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2025 | ENGR Engineering Final | Not Ready | ||
| 08/22/2025 | ENGR Engineering Final | Partial Pass | Bathrooms and lobby okay for Level 4 TCO |