Permit: TC-COM-0224-00239
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
9210 S HOUGHTON RD UNIT 110
Address NEW:
9210 S HOUGHTON RD UNIT 110
Apply Date:
02/05/2024
Applicant:
Stan Pallette
Description:
TI for barber shop in existing gray shell (SportClips)
Permit Reviews
Permit Number - TC-COM-0224-00239
Permit Status: Complete
Permit Description: TI for barber shop in existing gray shell
(SportClips)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 02/26/2024 | REQUIRES RESUBMIT |
| 06/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/05/2024 | APPROVED |
| 07/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/22/2024 | APPROVED |
| 05/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/28/2024 | REQUIRES RESUBMIT |
| 05/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/22/2024 | APPROVED |
| 03/19/2024 | COMMERCIAL REVIEW - LIMITED v.3 | 03/19/2024 | APPROVED |
| 03/19/2024 | RESTAMP - COMMERCIAL v.1 | 03/20/2024 | APPROVED |
| 03/15/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 03/19/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0224-00239
Permit Status: Complete
Permit Description: TI for barber shop in existing gray shell
(SportClips)
| Date | Description | Comments |
|---|---|---|
| 03/18/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 02/06/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/18/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00239
Permite Description: TI for barber shop in existing gray shell
(SportClips)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/03/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not required, there is no gas to this business. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00239
Permit Description: TI for barber shop in existing gray shell
(SportClips)
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2024 | BULD - Electrical Clearance | Passed | Ok to set for construction power | |
| 03/26/2024 | COT - LCPL - Rough Soil | Passed | Ok to cover progress areas. | |
| 04/05/2024 | COT - LCPL - Plumbing Intermediate | Passed | Rough plumbing complete in metal stud framed walls to above ceiling. Okay to proceed with drywall installation. | |
| 04/05/2024 | COT - LCBU - Framing | Passed | Rough framing completed, rough-in of electrical and plumbing is complete in framed walls to above ceiling. Okay to proceed with drywall installation. | |
| 04/05/2024 | COT - LCEL - Electrical Intermediate | Passed | Electrical rough-in is complete in framed walls to above ceiling. Okay to proceed with drywall installation. | |
| 05/03/2024 | COT - LCME - Mechanical Intermediate | Passed | Mechanical units, ductwork, and registers are properly installed above drop ceiling. Okay to install ceiling tiles in grid ceiling. | |
| 05/03/2024 | COT - LCEL - Electrical Above Ceiling | Passed | Electrical conduit and boxes are properly installed and secured to rafters, light fixtures are properly installed in grid ceiling and are properly supported by 2 wires in opposite corners. Okay to install ceiling tiles in grid ceiling. | |
| 05/15/2024 | COT - FCON - Fire - Final | Passed | ||
| 05/15/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 05/15/2024 | COT - LCBU - Building Final | Passed | ||
| 05/15/2024 | COT - LCEL - Electrical Final | Passed | ||
| 05/15/2024 | COT - LCME - Mechanical Final | Passed | ||
| 05/15/2024 | COT - LCPL - Plumbing Final | Passed | ||
| 05/15/2024 | ENGR Engineering Final | Passed | ||
| 05/24/2024 | COT - HCBU - TCO | Passed | 5/24/24: level 4 TCO | |
| 05/28/2024 | TRSP - ROW - Final/Close-Out | Passed |