Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0224-00239
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/06/2024 | Site Zoning | APPROVED | |||
| 02/21/2024 | Water - PDSD | APPROVED | |||
| 02/13/2024 | Site Engineering | NOT REQUIRED | |||
| 02/22/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/22/2024 | Commercial Building | REQUIRES RESUBMIT | 9210 S HOUGHTON RD Unit:110 TUCSON, AZ 85747 TI for barber shop in existing gray shell (SportClips) Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. Please provide the Sympateco Specification & Installation Manual with next submittal as required on the Cover Sheet. IBC 107.2.1 2. Please amend the plans to provide an architectural site plan. Site accessibility provisions of IEBC Section 305.7 require an accessible route to the primary entry of the building and toilet facility serving customers. Please show the standard and accessible parking spaces and the accessible route(s) including ramps. 3. Please amend plans to reference the shell permit number in the plan set for the 1st Tenant Improvement. COT submittal checklist 4. Please amend plans to provide the use of each room, for example the Equipment room appears to be an employee Break/Laundry room. 5. Please amend Exiting plans to provide the square footage, occupant load factor reflecting the use of the space, and the total occupants for each room and space. Additionally, please update the occupant load after all spaces are accounted for. IBC 107.2.3, IBC 1004.5 6. Please provide a plumbing fixture analysis. IBC chapter 29 7. Please provide the fire rated assembly on the plans for the 1-hour rated wall between this space and the A-2 space. IBC 107.2.1 8. Please amend plans to show the service counters and employee sink is accessible IBC Chapter 11 9. Please amend plans to provide a detail indicating the transition from the floor to the wall is a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. IBC 1209.2.1 10. Please amend plans to provide a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. IBC 1209.2.2 For example, ceramic tile with sealed grout, FRP wall panels with moisture sealed joints. 11. Provide metal stud table indicating height limits and stud gauge to be used for new interior partition walls with adequate strength and stiffness to resist the loads to which they are subjected but not less than a horizontal load of 5 psf. IBC 1607.15. Additionally, include connections at top of wall and to existing structure. Mark Masek Plans Examiner Mark.masek@tucsonaz.gov 520-837-4994 |
||
| 02/20/2024 | Commercial Electrical | REQUIRES RESUBMIT | Provide compliance with the 2018 IECC for the lighting. | ||
| 02/21/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. If space is provided for the installation of a clothes dryer now or in the future, the installation of an exhaust duct will be required. Reference: Section 504.8.6, IMC 2018. 2. Calculation of the required minimum ventilation for air handlers serving multiple zones requires the balancing data (supply CFM) for each zone and the calculations described in Sections 403.3.1.1.2.3.1 through 403.3.1.1.2.3.4, IMC 2018. Reference: Section 403.3.1.1.2.3, IMC 2018. 3. The area for determining ventilation requirements is the net occupiable area, not the areas shown on the mechanical floor plan. Reference: Sections 202 and 403.3.1.1.1.1, IMC 2018. 4. Revise the exhaust airflow rate for the cutting floor and shampoo area to provide 0.5 CFM of exhaust per square foot. (Note that a barber shop only requires 7.5 CFM of outside air per person and 0.06 CFM of outside air per square foot.) Reference: Section 403.3.1.1, IMC 2018. |
||
| 02/21/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Specify that all proposed plumbing fixtures shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2018. 2. Verify that the metering faucet cycle for the lavatory will last for at least 10-seconds for accessibility. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Shampoo sink faucets shall have hot water limited to a maximum temperature of 120 degrees Fahrenheit using a device conforming to ASSE 1070. Each faucet shall also have integral check valves to prevent cross-over flow between the hot and cold water supplies. Reference: Section 412.10, IPC 2018. 4. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |
||
| 02/09/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 02/06/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |