Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1545 E COPPER ST
Address NEW:
1545 E COPPER ST
Apply Date:
02/23/2023
Applicant:
Kristopher Robertson
Description:
New Rise Above Building

Permit Reviews

Permit Number - TC-COM-0223-00705
Permit Status: Complete
Permit Description: New Rise Above Building
Start Date Submittal Complete Date Status  
12/21/2023 COMMERCIAL REVIEW - FULL v.1 01/24/2024 APPROVED Review Details
03/06/2023 COMMERCIAL REVIEW - FULL v.1 07/07/2023 REQUIRES RESUBMIT Review Details
07/26/2023 COMMERCIAL REVIEW - FULL v.3 08/14/2023 APPROVED Review Details
10/23/2024 RESTAMP - COMMERCIAL v.1 10/23/2024 APPROVED Review Details
07/13/2023 COMMERCIAL REVIEW - FULL v.2 07/13/2023 REQUIRES RESUBMIT Review Details
05/24/2024 COMMERCIAL REVIEW - FULL v.1 06/13/2024 APPROVED Review Details
12/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2024 APPROVED Review Details
12/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/17/2024 APPROVED Review Details
11/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/04/2024 APPROVED Review Details
08/30/2024 COMMERCIAL REVIEW - FULL REVISION v.1 10/23/2024 APPROVED Review Details
08/14/2023 RESTAMP - COMMERCIAL v.1 08/16/2023 APPROVED Review Details
12/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/23/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0223-00705
Permit Status: Complete
Permit Description: New Rise Above Building
Date Description Comments
11/07/2024 AIR BALANCING REPORT IS REQUIRED.
11/07/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
11/07/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
11/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/07/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
11/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/07/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
11/07/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/07/2024 Masonry Inspection Report submittal review is required.
11/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/07/2023 SPECIAL INSPECTION FOR EIFS IS REQUIRED
11/07/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
11/07/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
11/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/07/2024 WATER STERILIZATION REPORT IS REQUIRED PRIOR TO TCO.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00705
Permite Description: New Rise Above Building
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
01/29/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 1/29/24: North, south, west, and spread footings are properly dug with rebar reinforcement and steel columns bolt forms in place. 11 column footings are properly dug with rebar reinforcement and bolt form in place. Elevator pit forms are in place with rebar reinforcement and angle iron supports for drain plate. Okay to proceed with concrete footings pour in these locations.
01/30/2024 COT - HCBU - Stem Wall/Retaining Wall N/A Partial Pass East end of the building exterior wall footings. F#3 page S1.5 okay for concrete placement in footing. 1/30/2024
10/18/2024 BULD - Electrical Clearance N/A Not Applicable
10/18/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00705
Permit Description: New Rise Above Building
Total Completed Inspections - 31
Date Description Inspector Results Comments
02/01/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
02/05/2024 COT - HCBU - Stem Wall/Retaining Wall Passed 2/5/24: South and Southwest corners of buildings okay for concrete placement.
08/27/2024 COT - HCBU - Roof Nailing Passed Approved via third-party
10/03/2024 COT - HCPL - Plumbing Above Ceiling Passed
10/03/2024 COT - HCPL - Plumbing Intermediate Passed
10/03/2024 COT - HCPL - Plumbing Roof Drains Passed
10/03/2024 COT - HCPL - Yard Water Line Passed
10/08/2024 COT - HCBU - Exterior Clips/Sheathing Passed
10/18/2024 COT - HCBU - Framing Passed
10/18/2024 COT - HCBU - Masonry Pregrout Passed
10/18/2024 COT - HCBU - Preslab Passed
10/18/2024 COT - HCEL - Electrical Underground Passed
10/18/2024 COT - HCPL - Rough Soil Passed
10/25/2024 zzzPDSD Building Division - Site Excavation/Layout/Rebar Passed
10/25/2024 COT - HCPL - Sewer Passed
11/08/2024 COT - HCME - Mechanical Intermediate Passed
11/08/2024 COT - HCME - Mechanical Above Ceiling Passed
11/13/2024 COT - HCEL - Electrical Above Ceiling Passed Storage room 102 approved. 11/13/2024
11/13/2024 COT - HCEL - Electrical Intermediate Passed Storage room 102 approved. 11/13/2024
12/03/2024 COT - HCEL - Grounding/Bonding Passed
12/03/2024 COT - HCEL - Outdoor Lighting Passed
12/03/2024 COT - HCBU - Building Above Ceiling Passed
12/10/2024 TRSP - ROW - Final/Close-Out Passed
12/10/2024 COT - FCON - Sprinkler - Final Passed
12/10/2024 COT - HCEL - Electrical Final Passed
12/20/2024 COT - HCME - Mechanical Final Passed
12/20/2024 COT - HCPL - Plumbing Final Passed
12/20/2024 ENGR Engineering Final Passed All items found by Martine have been corrected
12/24/2024 COT - FCON - Alarm - Final Passed
12/24/2024 COT - FCON - Fire - Final Passed
12/30/2024 COT - HCBU - Building Final Passed ok for C/O

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SALPOINTE CATHOLIC H.S. RISE ABOVE TAB REPORT_V1.PDF DOCUMENTS VIEW
50296652-PSA REPORT-SALPOINTE CATHOLIC HIGH SCHOOL_STAMPED 12-9-24_V1.PDF DOCUMENTS VIEW
SALPOINTE RISE ABOVE (CHLORINATION REPORT)-2024-12-10_V1.PDF DOCUMENTS VIEW
TC-COM-0223-00705__SALPOINTE HIGH SCHOOL RISE ABOVE BUILDING__63231174-2024-12-10_V1.PDF DOCUMENTS VIEW
TORQUE REPORT SALPOINTE_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
240226-REVIEWED - NOTED-JOIST AND DECK R2 2.26.2024 FOR COT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SCHS - RISE ABOVE BUILDING CONSTRUCTION DOCUMENTS (DELTA 6 - 7 SHEETS ONLY)_V1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SCHS - RISE ABOVE BUILDING CONSTRUCTION DOCUMENTS (DELTA 5 SHEETS ONLY)_V1.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V2.PDF DOCUMENTS VIEW
CONS-STANTEC_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1_PLAN SET_V1.PDF DOCUMENTS VIEW
REV1_GEOTECH_V1.PDF DOCUMENTS VIEW
REV1_REVISION LETTER_V1.PDF DOCUMENTS VIEW
REV1_STRUC CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SCHS - RISE ABOVE BUILDING STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
3_COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V2.PDF DOCUMENTS VIEW
CONS-STANTEC_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALC_STRUCT_V1.PDF DOCUMENTS VIEW
1_SCHS - RISE ABOVE BUILDING STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
3_COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V2.PDF DOCUMENTS VIEW
1_SCHS - RISE ABOVE BUILDING STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
3_COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
1_SCHS - RISE ABOVE BUILDING STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
3_COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V2.PDF DOCUMENTS VIEW
STANTEC PSA_V1.PDF DOCUMENTS VIEW
STANTEC_SPEC_INSP_CERT-2023-07-07_V1.PDF DOCUMENTS VIEW