Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 11310001A


Addresses:

1545 E COPPER ST


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Framing

Permit Number - TC-COM-0223-00705

Inspection Description - COT - HCBU - Framing

Inspection Status - Partial Pass

Date Description Inspector Results Comments
06/27/2024 COT - HCBU - Framing Partial Pass
06/28/2024 COT - HCBU - Framing Partial Pass
07/12/2024 COT - HCBU - Framing Partial Pass
08/06/2024 COT - HCBU - Framing Partial Pass 8/6/24 partial approval for interior walls first floor OK to one side only walls are not inspected at this time
8/6/24 Partial approval for restroom, exterior walls, ok to insulate and install shear first floor
08/08/2024 COT - HCBU - Framing Partial Pass 8/8/24 condensate and overflow for water heater on the south west classroom is not terminated outside and not supported, ok to insulate interior walls
08/13/2024 COT - HCBU - Framing Partial Pass 8/13/24 partial approval for first and second floor wall framing OK to insulate and drywall
08/19/2024 COT - HCBU - Framing Not Ready 8/19/24 not ready called for construction meeting
08/27/2024 COT - HCBU - Framing Partial Pass 8/27/24 partial approval for hard lids at classroom entries first floor and building north and south entries OK to install drywall
09/13/2024 COT - HCBU - Framing Partial Pass Partial approval for East facing exterior wall first floor and second floor
Partial or approval for West facing exterior wall first and second floor
Partial approval for South face the exterior wall and stair enclosure. OK to install sheeting
8/6/24 partial approval for interior walls first floor OK to one side only walls are not inspected at this time
8/6/24 Partial approval for restroom, exterior walls, ok to insulate and install shear
8/8/24 condensate and overflow for water heater on the south west classroom is not terminated outside and not supported, ok to insulate interior walls
8/13/24 partial approval for first and second floor wall framing OK to insulate and drywall
8/19/24 not ready called for construction meeting
8/27/24 partial approval for hard lids at classroom entries and building north and south entries OK to install drywall
9/13/14: hard lid framing at rooms 108,109, corrridor 101 and 106.
09/18/2024 COT - HCBU - Framing Partial Pass 9/18/24 alcove framing in all entry's and reception area on 2nd floor approved
09/24/2024 COT - HCBU - Framing Partial Pass 9/24/24 partial approval above ceiling in rooms 208 and 209 ok to proceed
10/18/2024 COT - HCBU - Framing Passed