Permit: TC-COM-0124-00215
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
6175 S MIDVALE PARK RD BLDG 1
Address NEW:
6175 S MIDVALE PARK RD BLDG 1
Apply Date:
01/31/2024
Applicant:
Carlos Navarro
Description:
BLDG A - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Permit Reviews
Permit Number - TC-COM-0124-00215
Permit Status: Issued
Permit Description: BLDG A - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/09/2024 | COMMERCIAL REVIEW - FULL v.3 | 05/08/2024 | REQUIRES RESUBMIT |
| 02/08/2024 | COMMERCIAL REVIEW - FULL v.2 | 03/18/2024 | REQUIRES RESUBMIT |
| 08/27/2024 | RESTAMP - COMMERCIAL v.1 | 08/29/2024 | APPROVED |
| 02/02/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/02/2024 | REQUIRES RESUBMIT |
| 08/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/19/2024 | APPROVED |
| 07/11/2024 | RESTAMP - COMMERCIAL v.1 | 07/16/2024 | APPROVED |
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/21/2025 | REQUIRES RESUBMIT |
| 07/11/2024 | COMMERCIAL REVIEW - FULL v.5 | 07/11/2024 | APPROVED |
| 02/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | APPROVED |
| 06/25/2024 | COMMERCIAL REVIEW - FULL v.4 | 07/08/2024 | REQUIRES RESUBMIT |
| 04/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 04/24/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0124-00215
Permit Status: Issued
Permit Description: BLDG A - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 07/01/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 07/01/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
| 07/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/01/2024 | Post-Tension Inspection Report is required. |
| 07/01/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0124-00215
Permit Status: Issued
Permit Description: BLDG A - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Date | Description | Comments |
|---|---|---|
| 02/02/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 02/02/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/11/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0124-00025 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 02/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/01/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0124-00215
Permite Description: BLDG A - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Inspections - 15
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2025 | COT - HCBU - Framing | N/A | Partial Pass | 3-14-25, Building 1 nailing for decking approved. Okay to continue with construction. |
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| 04/28/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 4-28-25, roof nailing for Building A approved. Okay to continue with construction. |
| 05/14/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 5/14/25: 1st floor exterior clips and sheathing passed, 2nd floor exterior clip and sheathing partial pass. Pending CS16 at shear walls on 2nd floor |
| 12/06/2024 | COT - HCBU - Preslab | N/A | Partial Pass | 12/6/24: reinforcement per plan at building slab. Pending breezeways. |
| 07/29/2025 | COT - HCPL - Yard Water Line | N/A | Partial Pass | 7/29/25: partial pass for 20' run of water line from meter location to building |
| 09/03/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 9-3-25: partial pass for MEP's for upstair units on Building 1. Firefoam all chutes and between kitchen exhausts'. |
| 09/03/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 9-3-25: partial pass for MEP's for upstair units on Building 1. Firefoam all chutes and between kitchen exhausts'. |
| 09/03/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 9-3-25: partial pass for MEP's for upstair units on Building 1. Firefoam all chutes and between kitchen exhausts'. |
| 08/22/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 8.21.25: Partial intermediate EW3 walls electrical at balcony's, 1st and 2nd floor. |
| 08/22/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 8.21.25: Partial intermediate EW3 walls electrical at balcony's, 1st and 2nd floor. |
| 09/04/2025 | COT - HCME - Mechanical Progress | N/A | Partial Pass | 9-4-25: firefoam penetrations at marked locations. Add blocking /firefoam where called out during the inspection. Firefoam is required at all chutes/and at kitchen exhaust Boca plates throughout both levels. These items must be inspected before closing out MEP's. |
| 11/21/2024 | COT - HCBU - Building Progress | N/A | Not Ready | 11/21/24: not ready |
| 10/29/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Underground Rough Plumbing Inspection Bldg. A. Okay to backfill progress areas. Shading required. 10/29/2024 |
| 09/09/2025 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 9-9-25: Unit's 114, 113, 123, 124 on Building 1 verified per SW9. Okay to continue construction at progress areas. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0124-00215
Permit Description: BLDG A - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2025 | COT - HCBU - Preslab | Passed | 12/6/24: reinforcement per plan at building slab. Pending breezeways. 7/11/25:Breezeway rebar inspection Bldg.A |
|
| 10/10/2025 | COT - BULD - SWG Clearance | Passed | 10-10-25: Electrical clearance inspection-okay to energize Building 1 unit's 1105, 1106, 1205, 1206, 1107, 1108, 1208, 1207, 1203, 1204, 1201, 1202, 1103, 1104, 1101, 1102, house panel. An email to NNava@ TEP.com for an ECO clearance was issued. | |
| 10/17/2025 | BULD - Electrical Clearance | Passed | 10-10-25: Electrical clearance inspection-okay to energize Building 1 unit's 1105, 1106, 1205, 1206, 1107, 1108, 1208, 1207, 1203, 1204, 1201, 1202, 1103, 1104, 1101, 1102, house panel. An email to NNava@ TEP.com for an ECO clearance was issued. |