Inspection Status: Passed

Inspection History: COT - HCEL - Electrical Intermediate

Date Description Inspector Results Comments
01/08/2026 COT - HCEL - Electrical Intermediate Passed 1-8-26: electrical intermediates approved.
08/22/2025 COT - HCEL - Electrical Intermediate Partial Pass 8.21.25: Partial intermediate EW3 walls electrical at balcony's, 1st and 2nd floor.
09/04/2025 COT - HCEL - Electrical Intermediate Partial Pass 9-4-25: firefoam penetrations at marked locations. Add blocking /firefoam where called out during the inspection. Firefoam is required at all chutes/and at kitchen exhaust Boca plates throughout both levels. These items must be inspected before closing out MEP's.