Inspection Status: Passed
Inspection History: COT - HCEL - Electrical Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 01/08/2026 |
COT - HCEL - Electrical Intermediate |
|
Passed |
1-8-26: electrical intermediates approved. |
| 08/22/2025 |
COT - HCEL - Electrical Intermediate |
|
Partial Pass |
8.21.25: Partial intermediate EW3 walls electrical at balcony's, 1st and 2nd floor. |
| 09/04/2025 |
COT - HCEL - Electrical Intermediate |
|
Partial Pass |
9-4-25: firefoam penetrations at marked locations. Add blocking /firefoam where called out during the inspection. Firefoam is required at all chutes/and at kitchen exhaust Boca plates throughout both levels. These items must be inspected before closing out MEP's. |