Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Progress 

Date Description Inspector Results Comments
03/18/2025 COT - HCPL - Plumbing Progress  Partial Pass 3-18-25, partial pass for approximately 100' of sewer line located on the west side of Building C. Okay to backfill progress areas-shading required.
03/24/2025 COT - HCPL - Plumbing Progress  Partial Pass Underground Rough Plumbing Inspection Bldg. A. Okay to backfill progress areas. Shading required. 10/29/2024
3-18-25, partial pass for approximately 100' of sewer line located on the west side of Building C. Okay to backfill progress areas-shading required.
3/24/25: sewer inspection of sewer pipe going into manhole from Bldg. A and B
09/04/2025 COT - HCPL - Plumbing Progress  Partial Pass 9-4-25: firefoam penetrations at marked locations. Add blocking /firefoam where called out during the inspection. Firefoam is required at all chutes/and at kitchen exhaust Boca plates throughout both levels. These items must be inspected before closing out MEP's.
09/09/2025 COT - HCPL - Plumbing Progress  Partial Pass 9-9-25: Verified pressure test for backflows at 50psi for 15 minutes at Bldg. A, B, C, D. Okay to continue construction at progress areas.
10/29/2024 COT - HCPL - Plumbing Progress  Partial Pass Underground Rough Plumbing Inspection Bldg. A. Okay to backfill progress areas. Shading required. 10/29/2024