Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Progress
Permit Number - TC-COM-0124-00215
Inspection Description - COT - HCPL - Plumbing Progress
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | COT - HCPL - Plumbing Progress | Partial Pass | 3-18-25, partial pass for approximately 100' of sewer line located on the west side of Building C. Okay to backfill progress areas-shading required. | |
| 03/24/2025 | COT - HCPL - Plumbing Progress | Partial Pass | Underground Rough Plumbing Inspection Bldg. A. Okay to backfill progress areas. Shading required. 10/29/2024 3-18-25, partial pass for approximately 100' of sewer line located on the west side of Building C. Okay to backfill progress areas-shading required. 3/24/25: sewer inspection of sewer pipe going into manhole from Bldg. A and B |
|
| 09/04/2025 | COT - HCPL - Plumbing Progress | Partial Pass | 9-4-25: firefoam penetrations at marked locations. Add blocking /firefoam where called out during the inspection. Firefoam is required at all chutes/and at kitchen exhaust Boca plates throughout both levels. These items must be inspected before closing out MEP's. | |
| 09/09/2025 | COT - HCPL - Plumbing Progress | Partial Pass | 9-9-25: Verified pressure test for backflows at 50psi for 15 minutes at Bldg. A, B, C, D. Okay to continue construction at progress areas. | |
| 10/29/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Underground Rough Plumbing Inspection Bldg. A. Okay to backfill progress areas. Shading required. 10/29/2024 |