Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2025 |
COT - HCBU - Building Above Ceiling |
|
Partial Pass |
8.21.25: Partial intermediate EW3 walls electrical at balcony's, 1st and 2nd floor. |
| 08/26/2025 |
COT - HCBU - Building Above Ceiling |
|
Re-inspection required |
8-26-25: Builsing 1-MEP'S not ready. |
| 08/29/2025 |
COT - HCBU - Building Above Ceiling |
|
Partial Pass |
8/29/25: Building 1- MEP's above ceiling approved on second floor. |
| 09/04/2025 |
COT - HCBU - Building Above Ceiling |
|
Partial Pass |
9-4-25: firefoam penetrations at marked locations. Add blocking /firefoam where called out during the inspection. Firefoam is required at all chutes/and at kitchen exhaust Boca plates throughout both levels. These items must be inspected before closing out MEP's. |