Permit: T22CM07078
Permit Details
Apply Date:
09/15/2022
Applicant:
Jesus Cedeno
Description:
SFR
Permit Reviews
Permit Number - T22CM07078
Permit Status: Issued
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/15/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/05/2022 | COMPLETED |
03/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/24/2023 | APPROVED |
04/24/2023 | RESTAMP - RESIDENTIAL v.1 | 04/25/2023 | APPROVED |
05/02/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/24/2023 | APPROVED |
Conditions
Permit Number - T22CM07078
Permit Status: Issued
Permit Description: SFR
Date | Description | Comments |
---|---|---|
04/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
04/05/2023 | Missing Landscape Notes | |
04/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07078
Permite Description: SFR
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | see previous write ups, not ready please correct all penetrations with less than 18" of copper. |
10/31/2023 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | not ready for this inspection just yet |
02/21/2024 | RSPL - Plumbing Progress | N/A | Not Ready | no DWV test several places top plate is needing foamed |
09/03/2024 | COT - RSME - Mechanical Underground | N/A | Not Applicable | |
02/21/2024 | RSEL - Electrical Progress | N/A | Partial Pass | Please make up neutrals and grounds on sub panel |
10/07/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 9/3/24: lock out caps at A/C condenser refrigerant lines, all exterior plastic piping must be UV protected, all plumbing fixtures must be installed at time of final inspection, Arc-fault breaker's required at laundry rooms, handrails at stairs not in at time of inspection, guard rails not installed at time of inspections, water hammer arrester must be installed at dishwasher, b-vent require 1" clearance from combustibles at garage, water heater exhaust must terminate 2' above highest wall portion, grading must be complete, please provide Ladder access. Engineering inspection must pass prior to final, Address must be installed on home at time of inspection.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. 10/7/24: lock out caps required at A/C condenser, all plumbing fixtures must be installed at time of final inspection,Arc Fault breaker's required throughout at subpanel, grading not completed, engineering final required prior to final inspection, storm collar required at b-vent. |
10/07/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 9/3/24: lock out caps at A/C condenser refrigerant lines, all exterior plastic piping must be UV protected, all plumbing fixtures must be installed at time of final inspection, Arc-fault breaker's required at laundry rooms, handrails at stairs not in at time of inspection, guard rails not installed at time of inspections, water hammer arrester must be installed at dishwasher, b-vent require 1" clearance from combustibles at garage, water heater exhaust must terminate 2' above highest wall portion, grading must be complete, please provide Ladder access. Engineering inspection must pass prior to final, Address must be installed on home at time of inspection.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. 10/7/24: lock out caps required at A/C condenser, all plumbing fixtures must be installed at time of final inspection,Arc Fault breaker's required throughout at subpanel, grading not completed, engineering final required prior to final inspection, storm collar required at b-vent. |
10/07/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 9/3/24: lock out caps at A/C condenser refrigerant lines, all exterior plastic piping must be UV protected, all plumbing fixtures must be installed at time of final inspection, Arc-fault breaker's required at laundry rooms, handrails at stairs not in at time of inspection, guard rails not installed at time of inspections, water hammer arrester must be installed at dishwasher, b-vent require 1" clearance from combustibles at garage, water heater exhaust must terminate 2' above highest wall portion, grading must be complete, please provide Ladder access. Engineering inspection must pass prior to final, Address must be installed on home at time of inspection.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. 10/7/24: lock out caps required at A/C condenser, all plumbing fixtures must be installed at time of final inspection,Arc Fault breaker's required throughout at subpanel, grading not completed, engineering final required prior to final inspection, storm collar required at b-vent. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07078
Permit Description: SFR
Total Completed Inspections - 19