Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - T22CM07078
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. Seal all top,penetrations. Seal off whole at tub upstairs. Secure gas lines. Insulate water lines coming in from the garage. Insulate hot water line in soffit area. Copper needs to be 18" minimum before transitions to pex at water heater. Missing two smoke detectors. Missing receptacle at powder room. Missing receptacle at landing area. (Stairs). Add nail plate to any line that is less than an 1'1/4. Block registers at three sides. Add fire blocking to were it's been taking down. (Provide a set of approved plans on site). Stopped inspection. 2/8/2024 | |
02/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | see previous write ups, not ready please correct all penetrations with less than 18" of copper. | |
03/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |