Permit: T22CM06407
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4120 S MELPOMENE WY
Address NEW:
4120 S MELPOMENE WY
Apply Date:
08/19/2022
Applicant:
James Kazal
Description:
R-Bedroom Addition
Permit Reviews
Permit Number - T22CM06407
Permit Status: Inspections
Permit Description: R-Bedroom Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/19/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/12/2022 | COMPLETED |
| 07/24/2023 | RESIDENTIAL NEW DWELLING v.5 | 07/24/2023 | APPROVED |
| 06/05/2023 | RESIDENTIAL NEW DWELLING v.3 | 06/12/2023 | REQUIRES RESUBMIT |
| 03/10/2023 | RESIDENTIAL NEW DWELLING v.2 | 03/10/2023 | REQUIRES RESUBMIT |
| 06/23/2023 | RESIDENTIAL NEW DWELLING v.4 | 07/21/2023 | REQUIRES RESUBMIT |
| 12/16/2022 | RESIDENTIAL NEW DWELLING v.1 | 01/17/2023 | REQUIRES RESUBMIT |
| 07/24/2023 | RESTAMP - RESIDENTIAL v.1 | 07/25/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM06407
Permit Status: Inspections
Permit Description: R-Bedroom Addition
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/14/2023 | HVAC Calculations must be submitted and approved prior to Mechanical Final |
Conditions
Permit Number - T22CM06407
Permit Status: Inspections
Permit Description: R-Bedroom Addition
| Date | Description | Comments |
|---|---|---|
| 07/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T22CM06407
Permite Description: R-Bedroom Addition
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2023 | COT - RSBU - Preslab | N/A | Not Applicable | |
| 12/15/2023 | RSEL - Electrical Progress | N/A | Not Ready | 12/15/23: not ready needed roof nailing inspection to cover and dry in |
| 12/15/2023 | RSME - Mechanical Progress | N/A | Not Ready | |
| 12/15/2023 | RSPL - Plumbing Progress | N/A | Not Ready | |
| 12/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Mechanical, electrical, & plumbing rough-in are complete. Exterior shear walls are properly installed and nailed off. Window frames are not installed they are a long lead item, was told that they won't be delivered until February 2024. Have approved for stucco work to be performed but holding back 12" around all windows and doors that are not installed at this time. Okay to insulate and sheet rock interior walls with the same requirements as stucco around windows. |
| 11/30/2023 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | Overhead and hydro approved on only the new construction. |
Completed Inspections
Permit Status: Inspections
Permit Number: T22CM06407
Permit Description: R-Bedroom Addition
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2023 | COT - RSPL - Sewer | Passed | 9/12/23: partial for interior underground exterior of house will need to be reinspected due to the rain today 9/14/23 ok to backfill once photos of tracer wire is sent. |
|
| 09/14/2023 | COT - RSPL - Rough Soil | Passed | ||
| 11/07/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/20/2023 | COT - RSBU - Roof Nailing | Passed | 12/20/23: existing roof sheathing is good to cover | |
| 08/08/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 09/03/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/03/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 09/03/2024 | COT - RSEL - Electrical Final | Passed | ||
| 09/03/2024 | COT - RSME - Mechanical Final | Passed | ||
| 09/03/2024 | RSBU - Building Final | Passed |