Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brad Samuels
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 3

Permit Reviews

Permit Number - T22CM01451
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 3
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
06/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/20/2024 APPROVED Review Details
06/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01451
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 3
Date Description Comments
06/11/2024 AIR BALANCING REPORT IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
06/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/11/2024 PCRWRD requests that the City of Tucson, add the PCRWRD Condition to the COT building permit #T22CM01449:ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATION IS ISSUED BY PDEQ FOR THE PRIVATE SEWER #P22SD00039 Gerry KoziolPima County DSD-Building Codes/Wastewater Utility Fee201 N Stone Ave Tucson, AZ 85701(520)724-6503
06/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
06/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/11/2024 WATER STERILIZATION REPORT IS REQUIRED.
06/11/2024 SHOP DRAWINGS REQUIRED FOR WOOD FLOOR JOISTS.
06/11/2024 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01451
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 3
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
03/06/2024 COT - FCON - Fire - Final N/A Partial Pass All exit signs shall illuminate under EM power. Fire extinguishers shall have current tags
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
04/05/2024 COT - LCBU - Sustainability N/A Not Applicable
06/13/2023 COT - LCPL - Plumbing Progress N/A Not Ready
12/12/2023 COT - LCBU - Building Progress N/A Partial Pass 12/12/23: permit extension.
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01451
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 3
Total Completed Inspections - 33
Date Description Inspector Results Comments
11/28/2022 COT - LCBU - Excavation/Rebar/Zoning Passed
11/28/2022 COT - LCEL - Electrical Underground Passed
12/14/2022 COT - LCPL - Rough Soil Passed
04/25/2023 COT - LCBU - Exterior Clips/Sheathing Passed
04/28/2023 COT - LCBU - Roof Nailing Passed OSB sheathing is properly nailed off. Okay to begin roofing process.
04/28/2023 COT - LCBU - Preslab Passed 4/28/23: concrete slab has been poured.
06/12/2023 COT - LCPL - Backwater Valve Passed
06/12/2023 COT - HCBU - Interior Shear Bracing Passed
06/12/2023 COT - LCEL - Electrical Intermediate Passed
06/12/2023 COT - LCBU - Framing Passed
06/12/2023 COT - LCME - Mechanical Above Ceiling Passed
06/27/2023 COT - LCME - Mechanical Intermediate Passed
06/27/2023 COT - LCPL - Plumbing Intermediate Passed
06/27/2023 COT - LCEL - Electrical Above Ceiling Passed
06/27/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
06/27/2023 COT - LCPL - Plumbing Roof Drains Passed
06/27/2023 COT - LCPL - Plumbing Above Ceiling Passed
06/27/2023 COT - LCPL - Sewer Passed
01/23/2024 COT - LCEL - Service Upgrade Passed 1/17/24: ECO Clearance on HPC3 with units 3101,3102,3103,3104,3105,3106,3107,3108,3201,3202,3203,3204,3205,3206,3207,3208,3301,3302,3303,3304,3305,3306,3307,3308, and GP2
1/22/24 resent clearances
01/22/2024 BULD - Electrical Clearance Passed 1/17/24: ECO Clearance on HPC3 with units 3101,3102,3103,3104,3105,3106,3107,3108,3201,3202,3203,3204,3205,3206,3207,3208,3301,3302,3303,3304,3305,3306,3307,3308, and GP2
01/24/2024 COT - LCEL - Electrical Progress Passed 1/17/24: ECO Clearance on HPC1 with units 3101,3102,3103,3104,3105,3106,3107,3108,3201,3202,3203,3204,3205,3206,3207,3208,3301,3302,3303,3304,3305,3306,3307,3308, and GARG 2
02/27/2024 COT - FCON - Sprinkler - Final Passed
03/28/2024 COT - FCON - Fire - Final Passed
04/05/2024 COT - FCON - Alarm - Final Passed
04/05/2024 COT - LCBU - Building Above Ceiling Passed
04/05/2024 COT - LCPL - Plumbing Progress Passed
04/05/2024 COT - LCEL - Outdoor Lighting Passed
04/05/2024 COT - LCBU - Building Progress Passed
04/05/2024 COT - LCME - Mechanical Progress Passed
04/11/2024 COT - LCPL - Plumbing Final Passed
04/11/2024 COT - LCME - Mechanical Final Passed
04/12/2024 COT - LCEL - Electrical Final Passed
05/31/2024 COT - LCBU - Building Final Passed 5/10/24: South half of building 3 passed. labeling A/C units will have to be permanent prior to final.
5/13/24: building 3 level has passed. Waiting for engineering to pass in order to give Level 4 TCO
5/31/24: Building 3 ok for CofO