Inspection Status: Not Ready

Inspection History: COT - LCBU - Building Final 

Permit Number - T22CM01451

Inspection Description - COT - LCBU - Building Final 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Building Final  Not Ready
04/05/2024 COT - LCBU - Building Final  Re-inspection required 4/5/24: all of building 3 is missing (insulation at water heaters, air gap required at condensate drain in laundry room, dishwashers not installed, T-tops missing on roof for dryer vent, UV coat plastic piping at roof, window locks), ADA unit missing (circuit at kitchen, panel schedule, bathroom and kitchen guards under sink), Unit 3208 missing lock out breaker for water heater, Unit 3207 bank plate missing at panel, Unit 3205 no power at kitchen circuit, Unit 3103 Condensate drain for A/C unit not ran, Unit 3104 water heater is not wired, Unit 3202 GFCI at kitchen not functioning properly, Unit 3301 Kitchen receptacle hot and neutral reversed and condensate not complete. Missing vent grills at breezeways.
04/11/2024 COT - LCBU - Building Final  Re-inspection required 4/5/24: all of building 3 is missing (insulation at water heaters, air gap required at condensate drain in laundry room, dishwashers not installed, T-tops missing on roof for dryer vent, UV coat plastic piping at roof, window locks), ADA unit missing (circuit at kitchen, panel schedule, bathroom and kitchen guards under sink), Unit 3208 missing lock out breaker for water heater, Unit 3207 bank plate missing at panel, Unit 3205 no power at kitchen circuit, Unit 3103 Condensate drain for A/C unit not ran, Unit 3104 water heater is not wired, Unit 3202 GFCI at kitchen not functioning properly, Unit 3301 Kitchen receptacle hot and neutral reversed and condensate not complete. Missing vent grills at breezeways.
4/11/24: ADA unit electrical problems with kitchen circuits.
04/12/2024 COT - LCBU - Building Final  Partial Pass 4/5/24: all of building 3 is missing (insulation at water heaters, air gap required at condensate drain in laundry room, dishwashers not installed, T-tops missing on roof for dryer vent, UV coat plastic piping at roof, window locks), ADA unit missing (circuit at kitchen, panel schedule, bathroom and kitchen guards under sink), Unit 3208 missing lock out breaker for water heater, Unit 3207 bank plate missing at panel, Unit 3205 no power at kitchen circuit, Unit 3103 Condensate drain for A/C unit not ran, Unit 3104 water heater is not wired, Unit 3202 GFCI at kitchen not functioning properly, Unit 3301 Kitchen receptacle hot and neutral reversed and condensate not complete. Missing vent grills at breezeways.
4/11/24: ADA unit electrical problems with kitchen circuits.
4/12/24: Ok for Level 4 TCO
05/31/2024 COT - LCBU - Building Final  Passed 5/10/24: South half of building 3 passed. labeling A/C units will have to be permanent prior to final.
5/13/24: building 3 level has passed. Waiting for engineering to pass in order to give Level 4 TCO
5/31/24: Building 3 ok for CofO