Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/31/2022
Applicant:
Mike Culbert
Description:
Expansion of the existing warehouse building with a Shipping & Receiving Office and administrative O

Permit Reviews

Permit Number - T22CM00730
Permit Status: Complete
Permit Description: Expansion of the existing warehouse building with a Shipping & Receiving Office and administrative O
Start Date Submittal Complete Date Status  
01/31/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 03/18/2022 COMPLETED Review Details
04/01/2022 RESUBMITTAL 04/12/2022 COMPLETED Review Details
04/14/2022 RESUBMITTAL 04/20/2022 COMPLETED Review Details
06/06/2022 RESUBMITTAL 06/09/2022 COMPLETED Review Details
09/06/2022 REVISION - - 1ST 09/26/2022 COMPLETED Review Details
06/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/10/2024 APPROVED Review Details
11/25/2022 COMMERCIAL REVIEW - FULL v.2 12/23/2022 APPROVED Review Details
11/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 11/03/2023 APPROVED Review Details
11/14/2022 COMMERCIAL REVIEW - FULL v.1 11/15/2022 REQUIRES RESUBMIT Review Details
04/17/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/20/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM00730
Permit Status: Complete
Permit Description: Expansion of the existing warehouse building with a Shipping & Receiving Office and administrative O
Date Description Comments
04/18/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/18/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
04/18/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/31/2024 SHOP DRAWINGS REQUIRED FOR PRE-ENGINEERED METAL BUILDINGS.
05/31/2024 SHOP DRAWINGS REQUIRED FOR FIRE ALARM

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00730
Permite Description: Expansion of the existing warehouse building with a Shipping & Receiving Office and administrative O
Total Outstanding Inspections - 16
Last Inspection Date Description Inspector Results Comments
12/05/2022 COT - LCBU - Building Above Ceiling N/A Partial Pass PARTIAL for the east office addition, okay tile progress areas
12/05/2022 COT - LCME - Mechanical Above Ceiling N/A Partial Pass PARTIAL for the east office addition, okay tile progress areas
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
01/24/2024 COT - BULD - SWG Clearance N/A Not Applicable
03/08/2023 COT - LCBU - Sustainability N/A Canceled Not a requirement for this project.
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
03/08/2023 COT - LCME - Mechanical Progress N/A Partial Pass Awaiting line sets to be installed.
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
02/03/2023 COT - LCBU - Building Final N/A Partial Pass South addition is complete and ready for occupancy. fire department has inspected and approved for occupancy. The east addition first floor restrooms, training room, and break room is complete and ready for occupancy.
10/26/2022 COT - LCBU - Preslab N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00730
Permit Description: Expansion of the existing warehouse building with a Shipping & Receiving Office and administrative O
Total Completed Inspections - 26
Date Description Inspector Results Comments
06/30/2022 COT - LCPL - Rough Soil Passed {Activity date: 06/30/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
08/02/2022 COT - LCBU - Roof Nailing Passed {Activity date: 08/02/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
08/04/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/04/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, East restrooms DWV & potable water lines in walls tested and approved.}
08/16/2022 COT - LCPL - Plumbing Progress Passed {Activity date: 08/16/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved including east addition}
01/18/2023 COT - LCEL - Electrical Final Passed electrical is complete. Panels & recepticals are properly labeled.
01/18/2023 COT - HCPL - Plumbing Above Ceiling Passed above ceiling mechanical, plumbing, and electrical is complete and meets plans & code.
01/18/2023 COT - HCEL - Electrical Above Ceiling Passed
02/03/2023 COT - LCPL - Plumbing Final Passed plumbing is complete, all restrooms, water fountains, and break rooms sinks are functional.
03/08/2023 COT - LCEL - Outdoor Lighting Passed Exterior light fixtures meet standards for illumination.
03/08/2023 COT - HCBU - Interior Shear Bracing Passed Not a requirement for this project.
03/08/2023 COT - LCBU - Framing Passed Framing for fire pump room installed complete
03/08/2023 COT - LCBU - Exterior Clips/Sheathing Passed Exterior shear walls are properly screwed and anchored.
03/08/2023 COT - LCBU - Excavation/Rebar/Zoning Passed Concrete footing for fire pump room is complete
03/08/2023 COT - LCEL - Electrical Underground Passed Electrical conduits for fire pump room is complete and wires pulled.
11/08/2023 COT - FCON - Sprinkler - Final Passed
01/24/2024 COT - LCBU - Sustainability Passed
01/24/2024 COT - LCEL - Electrical Intermediate Passed
01/24/2024 COT - LCEL - Electrical Progress Passed
01/24/2024 COT - LCME - Mechanical Final Passed
01/24/2024 COT - LCME - Mechanical Intermediate Passed
01/24/2024 COT - LCME - Mechanical Progress Passed
01/24/2024 COT - LCBU - Building Progress Passed
01/24/2024 COT - FCON - Fire - Final Passed
01/25/2024 COT - LCBU - Building Final Passed
05/30/2024 COT - FCON - Alarm - Final Passed
05/30/2024 COT - LCBU - Preslab Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
T22CM00730 - PEMB -ERFT EXPANSION PERMIT PACKAGE-FULL REVIEW_V1.PDF DOCUMENTS VIEW
T22CM00730 - PEMB_PERMIT PACKAGE-FULL REVIEW_V1.PDF DOCUMENTS VIEW
T22CM00730 - TEP WAREHOUSE ADDITIONS YARD EXPANSION SPECIAL INSPECTION-2023-11-02_V2.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SPECIFICATION SHEETS.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1_1 T22CM00730- PLAN SET_V1.PDF DOCUMENTS VIEW