Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/28/2021
Applicant:
Kaye Bagley
Description:
3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im

Permit Reviews

Permit Number - T21CM09907
Permit Status: Complete
Permit Description: 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im
Start Date Submittal Complete Date Status  
03/12/2022 RESUBMITTAL 05/02/2022 COMPLETED Review Details
05/12/2022 RESUBMITTAL 05/27/2022 COMPLETED Review Details
08/19/2022 REVISION - - 1ST 09/21/2022 COMPLETED Review Details
09/27/2022 REVISION - - 1ST 09/30/2022 COMPLETED Review Details
10/03/2022 REVISION - - 1ST 10/05/2022 COMPLETED Review Details
12/28/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 02/03/2022 COMPLETED Review Details
04/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/02/2024 REQUIRES RESUBMIT Review Details
04/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/18/2024 REQUIRES RESUBMIT Review Details
06/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/04/2024 APPROVED Review Details
05/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 05/20/2024 APPROVED Review Details
11/17/2022 COMMERCIAL REVIEW - FULL v.1 11/17/2022 APPROVED Review Details

Conditions

Permit Number - T21CM09907
Permit Status: Complete
Permit Description: 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im
Date Description Comments
05/23/2024 AIR BALANCING REPORT IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/12/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/22/2024 SHOP DRAWINGS REQUIRED FOR ALTERNATE STAIR DESIGN
03/22/2024 SHOP DRAWINGS REQUIRED FOR ELEVATOR
03/22/2024 SHOP DRAWINGS REQUIRED FOR FIRE ALARM
03/22/2024 SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLER
03/22/2024 SHOP DRAWINGS REQUIRED FOR SIGNAGE
04/12/2024 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
01/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/22/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/12/2024 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
05/23/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM09907
Permite Description: 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im
Total Outstanding Inspections - 21
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - HCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
05/02/2023 COT - HCPL - Sewer N/A Partial Pass 5-2-23: From Building North to lateral, and approx 40 Feet East for RV run.
06/06/2023 COT - HCBU - Framing N/A Partial Pass 3-17-23: Basement.
4-25-23: Level one; North half.
6/6/23: level 2 all framing, level 3 deck.
01/05/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
12/19/2023 COT - HCEL - Electrical Final N/A Not Ready
01/05/2024 COT - HCPL - Plumbing Final N/A Canceled
08/29/2023 COT - HCPL - Plumbing Progress N/A Canceled
01/13/2023 COT - HCBU - Building Progress N/A Partial Pass Cast in place wall on West side.
10/31/2023 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass 9/11/23: Den-shield on west wall complete.
10/31/23: lath on south end of building nailing per schedule.
03/18/2024 COT - HCBU - Sustainability N/A Not Applicable
08/23/2023 COT - HCEL - Electrical Progress N/A Partial Pass Bathrooms level one.
08/02/2023 COT - HCEL - Electrical Underground N/A Partial Pass
03/18/2024 COT - HCPL - Backwater Valve N/A Not Applicable
03/18/2024 COT - HCBU - Interior Shear Bracing N/A Not Applicable
05/05/2023 COT - HCPL - Rough Soil N/A Partial Pass 5-5-23: Water test on exterior.
02/15/2023 COT - HCBU - Masonry Pregrout N/A Partial Pass 1st lift of South site wall. 17’ 4” at West stair well.
10/26/2022 COT - FCON - Fire - Final N/A Partial Pass Waiting for approval of BDA fire alarm permit. Everything else is approved.
09/29/2023 COT - HCBU - Building Above Ceiling N/A Partial Pass 9/29/23: level 1 & 2 restrooms above ceiling approved.
08/23/2023 COT - HCEL - Electrical Above Ceiling N/A Canceled
04/28/2023 COT - HCBU - Preslab N/A Partial Pass 4-28-23: Level Two, North half.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09907
Permit Description: 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im
Total Completed Inspections - 33
Date Description Inspector Results Comments
12/08/2022 COT - HCBU - Excavation/Rebar/Zoning Passed
08/07/2023 COT - HCPL - Plumbing Roof Drains Passed 8/7/23: 6 sets of roof drains approved.
08/23/2023 COT - HCPL - Plumbing Intermediate Passed
08/23/2023 COT - HCPL - Sewer Passed
09/29/2023 COT - HCME - Mechanical Progress Passed 9/29/23: level 1 & 2 restrooms above ceiling approved.
11/28/2023 COT - HCBU - Framing Passed
01/05/2024 COT - HCME - Mechanical Final Passed
01/16/2024 COT - HCEL - Electrical Final Passed
01/18/2024 COT - HCPL - Plumbing Final Passed
03/15/2024 COT - FCON - Alarm - Final Passed
03/15/2024 COT - FCON - Sprinkler - Final Passed
03/18/2024 COT - HCBU - TCO Passed
03/18/2024 COT - HCBU - Roof Nailing Passed
03/18/2024 COT - HCPL - Plumbing Progress Passed
03/18/2024 COT - HCBU - Building Progress Passed
03/18/2024 COT - HCME - Mechanical Intermediate Passed
03/18/2024 COT - LCPL - Sewer Passed
03/18/2024 COT - HCBU - Exterior Clips/Sheathing Passed
03/18/2024 COT - HCEL - Electrical Progress Passed
03/18/2024 COT - HCEL - Electrical Underground Passed
03/18/2024 COT - HCEL - Electrical Intermediate Passed
03/18/2024 COT - HCEL - Outdoor Lighting Passed
03/18/2024 COT - HCPL - Plumbing Above Ceiling Passed
03/18/2024 COT - FCON - Underground Flush Passed
03/18/2024 COT - HCPL - Rough Soil Passed
03/18/2024 FCON – OH Piping & Hydro Passed
03/18/2024 COT - HCBU - Masonry Pregrout Passed
03/18/2024 COT - HCPL - Yard Water Line Passed
03/20/2024 ENGR Engineering Final Passed
05/22/2024 COT - HCBU - Building Above Ceiling Passed
05/22/2024 COT - HCEL - Electrical Above Ceiling Passed
05/22/2024 COT - HCBU - Preslab Passed
05/24/2024 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
22-070M FOOTHILLS RV AND STORAGE 2ND CONCRETE AND GROUT LETTER_V3-2024-05-07_V3.PDF DOCUMENTS VIEW
22-070M, FOOTHILLS RV AND STORAGE, CONCRETE LETTER_V3-2024-05-07_V3.PDF DOCUMENTS VIEW
23015-SFS-FOOTHILLS RV - STORAGE AB 4-24-24 CITY APPROVED R3_V3_V3.PDF DOCUMENTS VIEW
23015-SFS-FOOTHILLS RV - STORAGE R2_V2 STAMPED_V3.PDF DOCUMENTS VIEW
FOOTHILLS FA PERMIT 5-2-24_V3_V3.PDF DOCUMENTS VIEW
SCOTT FIRE AB 4-17-24 STAMPED R3_V3_V3.PDF DOCUMENTS VIEW
STAIRS FINAL SHOPDRAWING_V3_V3.PDF DOCUMENTS VIEW
SUBMITTAL 14-200-1.3 ELEVATOR FINAL PLANS FOR CONSTRUCTION_V3_V3.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FOOTHILL RV AND STORAGE.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SUB 2 BULLETIN NO 1 - CITY CHANGES.PDF DOCUMENTS VIEW
SUB 2 BULLETIN NO 2 - INTERNAL CHANGES.PDF DOCUMENTS VIEW
SUB 2 GEOTECH REPORT.PDF DOCUMENTS VIEW
SUB 2 PLAN SET.PDF DOCUMENTS VIEW
SUB 2 RESPONSE TO COMMENTS.PDF DOCUMENTS VIEW
SUB 2 STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
PLAN SET REV1.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
STRUCUTRAL CALCS.PDF DOCUMENTS VIEW