Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCBU - Preslab
Permit Number - T21CM09907
Inspection Description - COT - HCBU - Preslab
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Preslab | Not Ready | ||
10/26/2022 | COT - HCBU - Preslab | Not Ready | ||
03/17/2023 | COT - HCBU - Preslab | Partial Pass | 3-17-23: North half of Level one. | |
03/18/2024 | COT - HCBU - Preslab | Passed | ||
03/24/2023 | COT - HCBU - Preslab | Partial Pass | March 24th: 1st floor, south half OK to place concrete | |
04/25/2023 | COT - HCBU - Preslab | Partial Pass | 4-25-23: Level two, North half. | |
04/28/2023 | COT - HCBU - Preslab | Partial Pass | 4-28-23: Level Two, North half. | |
05/22/2024 | COT - HCBU - Preslab | Passed | ||
06/06/2023 | COT - HCBU - Preslab | Partial Pass | 3-17-23: Basement. 4-25-23: Level one; North half. 6/6/23: level 2 all framing, level 3 deck. |
|
11/15/2022 | COT - HCBU - Preslab | Partial Pass | North side of slab only. |