Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/02/2021
Applicant:
Michelle Virgin
Description:
Shell permit Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for

Permit Reviews

Permit Number - T21CM08621
Permit Status: Complete
Permit Description: Shell permit Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Start Date Submittal Complete Date Status  
03/19/2022 RESUBMITTAL 05/16/2022 COMPLETED Review Details
05/24/2022 RESUBMITTAL 06/03/2022 COMPLETED Review Details
06/22/2022 RESUBMITTAL 08/01/2022 COMPLETED Review Details
11/02/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 12/08/2021 COMPLETED Review Details
11/21/2022 COMMERCIAL REVIEW - FULL v.1 12/14/2022 APPROVED Review Details
12/05/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/05/2023 APPROVED Review Details
02/14/2023 COMMERCIAL REVIEW - FULL v.1 03/14/2023 APPROVED Review Details
02/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/28/2024 APPROVED Review Details
01/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/16/2024 APPROVED Review Details

Conditions

Permit Number - T21CM08621
Permit Status: Complete
Permit Description: Shell permit Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Date Description Comments
06/24/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/24/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/24/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/24/2022 SHOP DRAWINGS REQUIRED FOR SPRINKLERS
06/24/2022 SHOP DRAWINGS REQUIRED FOR I JOISTS
06/24/2022 SHOP DRAWINGS REQUIRED FOR TRUSS CALCS
08/01/2022 Prior to permit issuance a General Contractor Letter (GCL) is required
08/01/2022 DO NOT ISSUE THIS PERMIT UNTIL DP21-0263 HAS BEEN ISSUED.
01/12/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/12/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08621
Permite Description: Shell permit Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
05/08/2023 COT - LCBU - Building Progress N/A Not Applicable
09/13/2023 COT - LCEL - Electrical Above Ceiling N/A Not Applicable
09/13/2023 COT - LCPL - Plumbing Above Ceiling N/A Not Applicable
10/16/2023 COT - BULD - SWG Clearance N/A Not Applicable
06/22/2023 COT - HCPL - Yard Water Line N/A Partial Pass 6-22-23: Line from building to future backflow location.
11/30/2023 COT - LCBU - Masonry Pregrout N/A Not Applicable
07/31/2023 COT - LCME - Mechanical Above Ceiling N/A Not Ready 7/31/23: Not ready for inspection.
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08621
Permit Description: Shell permit Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Total Completed Inspections - 33
Date Description Inspector Results Comments
03/06/2023 COT - HCEL - Grounding/Bonding Passed
05/12/2023 COT - LCBU - Roof Nailing Passed
05/12/2023 COT - LCBU - Exterior Clips/Sheathing Passed
05/24/2023 COT - LCPL - Plumbing Roof Drains Passed 5/24/23: 5 sets of roof drains approved to cover.
07/11/2023 COT - LCPL - Sewer Passed
07/11/2023 COT - LCPL - Rough Soil Passed
07/11/2023 COT - LCPL - Backwater Valve Passed
09/13/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
10/16/2023 BULD - Electrical Clearance Passed Approved new service for shell building, ECO Clearance to TEP is required for the "Owners Panel"
10/27/2023 COT - LCEL - Electrical Underground Passed Conduit for panels A & B
March 22nd: underground coundit on exterior south side of building and several stub-ins on same side
April 4th: east half (DMC)
10/27/23:grounding for 2 light pole bases per plan.
10/27/2023 COT - LCEL - Electrical Progress Passed
10/27/2023 COT - LCBU - Excavation/Rebar/Zoning Passed April 4th: east half (DMC)
4/7/23: west half of building. Interior pour strip on north & east & south sides. Rebar per plan.
10/27/23: 2 light pole bases approved.
11/30/2023 COT - HCPL - Yard Water Line Passed
11/30/2023 COT - LCME - Mechanical Final Passed
11/30/2023 COT - LCME - Mechanical Progress Passed
11/30/2023 COT - LCME - Mechanical Intermediate Passed
11/30/2023 COT - LCPL - Plumbing Intermediate Passed
11/30/2023 COT - LCEL - Electrical Final Passed
11/30/2023 COT - LCBU - Building Above Ceiling Passed
11/30/2023 COT - LCBU - Sustainability Passed
11/30/2023 COT - LCBU - Framing Passed
11/30/2023 COT - LCEL - Electrical Intermediate Passed
11/30/2023 COT - LCME - Mechanical Above Ceiling Passed
11/30/2023 COT - LCBU - Preslab Passed
11/30/2023 COT - LCEL - Outdoor Lighting Passed
11/30/2023 COT - LCBU - Stem Wall/Retaining Wall Passed
11/30/2023 COT - LCPL - Plumbing Progress Passed
11/30/2023 COT - LCPL - Plumbing Final Passed
11/30/2023 COT - HCBU - Interior Shear Bracing Passed
12/01/2023 COT - FCON - Sprinkler - Final Passed
12/05/2023 COT - FCON - Fire - Final Passed
12/05/2023 COT - FCON - Alarm - Final Passed
12/13/2023 COT - LCBU - Building Final Passed Shell building and tenant improvements are completed. Okay to issue Level 4 Certificate of Occupancy.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
T21CM08621.S.I.CLOSEOUT-UPDATED-SIGNED-2024-01-11_V1.PDF DOCUMENTS VIEW
22-017 TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
COMPLIANCE_CERT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SOILS_REPORT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
STRUCTURAL_CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV 1_PLAN SET_V1.PDF DOCUMENTS VIEW
NARRATIVE OF OWNER REVISIONS_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
GENERAL CONTRACTOR LETTER.PDF DOCUMENTS VIEW
COMPLIANCE CERT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
22-017 I-JOIST - TRUSS SUBMITTAL FOR CONSTRUCTION GEI REVIEWED 11-01-2022_V1.PDF DOCUMENTS VIEW