Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCPL - Sewer | Not Ready | ||
| 03/08/2023 | COT - LCPL - Sewer | Partial Pass | All soil piping inside east half of building approved to cover. The main building drain in the west half is approved to cover. The building sewer stub-up on the north side approved to cover with the tie-in at a later date. | |
| 06/21/2023 | COT - LCPL - Sewer | Partial Pass | All soil piping inside east half of building approved to cover. The main building drain in the west half is approved to cover. The building sewer stub-up on the north side approved to cover with the tie-in at a later date. 6/21/23: sewer from east end of building to tie-in approved |
|
| 07/11/2023 | COT - LCPL - Sewer | Passed |