Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Underground
Permit Number - T21CM08621
Inspection Description - COT - LCEL - Electrical Underground
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCEL - Electrical Underground | Not Ready | ||
03/14/2023 | COT - LCEL - Electrical Underground | Partial Pass | Conduit for panels A & B | |
03/22/2023 | COT - LCEL - Electrical Underground | Partial Pass | Conduit for panels A & B March 22nd: underground coundit on exterior south side of building and several stub-ins on same side |
|
04/04/2023 | COT - LCEL - Electrical Underground | Partial Pass | Conduit for panels A & B March 22nd: underground coundit on exterior south side of building and several stub-ins on same side April 4th: east half (DMC) |
|
10/27/2023 | COT - LCEL - Electrical Underground | Passed | Conduit for panels A & B March 22nd: underground coundit on exterior south side of building and several stub-ins on same side April 4th: east half (DMC) 10/27/23:grounding for 2 light pole bases per plan. |