Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
08/19/2021
Applicant:
Tucson Expediting & Development
Description:
RETAIL
Architects:
  • Amelia Elliott
Contractors:
  • CHASSE BUILDING TEAM INC***APA***

Permit Reviews

Permit Number - T21CM06766
Permit Status: C of o
Permit Description: RETAIL
Start Date Submittal Complete Date Status  
08/19/2021 3RD PARTY REVIEW - COMMERCIAL 09/28/2021 COMPLETED Review Details
10/21/2021 RESUBMITTAL - TI ALL 11/22/2021 COMPLETED Review Details
11/22/2021 RESUBMITTAL 11/30/2021 COMPLETED Review Details
12/20/2021 REVISION - - 1ST 01/26/2022 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T21CM06766
Permit Description: RETAIL
Total Completed Inspections - 47
Date Description Inspector Results Comments
12/21/2021 REINFORCED MASONRY PRE-GROUT TGAUSP Approved NR
12/28/2021 ELECTRIC - UNDERGROUND DMUNIZ Approved Approved, conduits under slab ok to backfill and prep slab.
12/28/2021 ELECTRIC - UFER DMUNIZ Approved Approved
12/28/2021 STEM WALL/RETAINING WALL DMUNIZ Approved Partial, CMU Stem from GL A-D, 3-5 OK for grout placement, Note: Inspection required for CMU Dock wall finish.
05/06/2022 PLUMBING - PRE SLAB TGAUSP Approved Approved
05/06/2022 BUILDING PRE-SLAB TGAUSP Approved Approved, okay for concrete placement
05/12/2022 ROOF NAILING TGAUSP Approved Approved for wood roofs and metal decking by special inspection
05/12/2022 EXT METAL CLIPS/EXT SHEATHING TGAUSP Approved Approved
05/12/2022 PLUMBING - GAS PRESSURE TEST TGAUSP Approved Approved
05/12/2022 ELECTRIC - CONSTRUCTION POWER TGAUSP Approved Approved, please send RECN Clearance to TEP for the construction power. *Note - This 2nd clearance is for the existing panel addressed 4755 S. Calle Sara Cruz, Lot 14 Temp.
06/08/2022 SHEET ROCK NAILING DMUNIZ Approved Approved
06/17/2022 PLUMBING - INTERMEDIATE ESTEVENS Approved Approved
06/17/2022 MECHANICAL - INTERMEDIATE ESTEVENS Approved Approved
06/17/2022 ELECTRIC - INTERMEDIATE ESTEVENS Approved Approved
06/17/2022 FRAMING ESTEVENS Approved Approved
06/28/2022 TEP CLEARANCE - PM TGAUSP Approved CODE ECO
06/28/2022 ELECTRIC - CABLE DROP TGAUSP Approved - Approved for 1000A SES panel, please send ECO Clearance to TEP
06/30/2022 MECHANICAL - HOODS TGAUSP Approved Approved 1st and 2nd fire wraps, pending final
07/15/2022 ELECTRIC - PROGRESS TGAUSP Approved - Approved for all interior panels, okay to test breakers and equipment
08/17/2022 MECHANICAL - ABOVE CEILING TGAUSP Approved Approved
08/17/2022 MECHANICAL - PROGRESS TGAUSP Approved Approved
08/17/2022 ELECTRIC - ABOVE CEILING TGAUSP Approved Approved
08/17/2022 BUILDING - PROGRESS TGAUSP Approved Approved
08/17/2022 PLUMBING - ABOVE CEILING TGAUSP Approved Approved
08/17/2022 PLUMBING - PROGRESS TGAUSP Approved Approved
08/17/2022 PLUMBING - ROUGH, SOIL TGAUSP Approved Approved
08/17/2022 EXCAVATION/LAYOUT REBAR & ZON TGAUSP Approved Approved
08/17/2022 GAS CLEARANCE TGAUSP Approved CODE
08/17/2022 PLUMBING - GAS PRESS TEST FNL TGAUSP Approved Approved with valves installed, please send Clearance to SWG for meter set
08/17/2022 MECHANICAL - PROGRESS TGAUSP Approved Approved
08/17/2022 PLUMBING - PROGRESS TGAUSP Approved Approved
08/17/2022 BUILDING - PROGRESS TGAUSP Approved Approved
08/17/2022 U VALUE FOR WINDOW TGAUSP Approved Approved
08/17/2022 STUCCO MESH TGAUSP Approved NA
08/22/2022 ELECTRIC - FINAL SCARRAZCO Approved approved
08/23/2022 PLUMBING - SEWER HCS CONNECT TGAUSP Approved Approved, 4" sanitary and grease line to existing 8" private sewer
08/24/2022 PLUMBING - MD GAS/PRECONST MTG TGAUSP Approved NA
08/25/2022 FIRE - ALARM FINAL CBASALDUA Approved
08/25/2022 FIRE SPKLR - FINAL CBASALDUA Approved
08/26/2022 BUILDING ABOVE CEILING TGAUSP Approved Approved
09/06/2022 PLUMBING - FINAL RSHERRY Approved REVIEW OF WATER DISINFECTION REPORT COMPLETED
09/08/2022 MECHANICAL - FINAL RSHERRY Approved REVIEW OF AIR BALANCE REPORT COMPLETED
09/09/2022 FIRE - FINAL CGates Approved The kitchen hood was approved on 9/1/22 T22FC00161.
09/09/2022 FIRE - KITCHEN EXH HOOD FINAL CGates Approved Was approved on 9/1/22 T22FC00161
09/12/2022 BUILDING - FINAL TLUNDBERG Approved AP
09/21/2022 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved Approved
09/21/2022 OUTDOOR LIGHTING FINAL JBURGE Approved . Approved. Lighting on building only; no parking lot lighting.

Documents

File Name Document Type  
BACKFLOW PREVENTION ASSEMBLY TEST REPORT.PDF DOCUMENTS VIEW
COFO.PDF DOCUMENTS VIEW
FIRE SPRINKLER TEST CERTIFICATE.PDF DOCUMENTS VIEW
PHOTO1.JPG DOCUMENTS VIEW
REV1_CUT SHEETS.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
TCO-T21CM06766.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
ENERGY MECH.PDF DOCUMENTS VIEW
PSA FOR STANTEC.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SPECIL INSPECTION CERT.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 1.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW