Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T21CM06766
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2022 | REINFORCED MASONRY PRE-GROUT | Approved | Approved | |
02/24/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial, top course bond beam, okay to grout all building walls | |
02/23/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial approval for the 6th and final lift at all building walls. Partial for (4) canopy bases | |
02/17/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial for the 4th lift on the west, east and north walls (20’) Okay to grout progress areas | |
02/16/2022 | REINFORCED MASONRY PRE-GROUT | Cancelled | Cancelled by Contractor (rain) | |
02/15/2022 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | NR, rescheduled for next day | |
02/14/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial for the 3rd lift on the east and north walls (15’) Okay to grout progress areas | |
02/11/2022 | REINFORCED MASONRY PRE-GROUT | Cancelled | - cancelled by Contractor | |
02/10/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial for the 3rd lift on the west and north walls (15’) Okay to grout progress areas | |
02/09/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial for the 2nd lift on the north and east walls (10’) Okay to grout progress areas | |
02/08/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial, second lift North side ok for grout. | |
02/02/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | PARTIAL FRONT BUILDING final lift 26’-6” ok to grout. | |
01/31/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial, 5th lift to 23’-6” ok to grout progress areas. | |
01/26/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial, continued 4th lift for South West elevation ok to grout and proceed. | |
01/25/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial for 4th lift (28’) from east end column line 1-2.5, all south end, ending at west end column line 3. | |
01/21/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial for 3rd lift (15’) from east end column line 1-2.5, all south end, ending at west end column line 3 | |
01/19/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | - Partial for 2nd lift (10’) from east end column line 1-2.5, all south end, ending at west end column line 3 | |
01/12/2022 | REINFORCED MASONRY PRE-GROUT | Partial Approval | - Partial, 1st 5’ lift at Gridline D-5 east around building to Gridline F-5, pending loading dock. Okay to grout progress areas | |
12/21/2021 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | NR |