Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2022 |
ELECTRIC - CONSTRUCTION POWER |
|
Approved |
Approved, please send RECN Clearance to TEP for the construction power. *Note - This 2nd clearance is for the existing panel addressed 4755 S. Calle Sara Cruz, Lot 14 Temp. |
| 01/07/2022 |
ELECTRIC - CONSTRUCTION POWER |
|
Approved |
Approved, please send RECN Clearance to TEP for the construction power. *Note - The clearance is for the existing panel addressed 4610 S. Landing Way, Lot 35, Temp. |
| 01/05/2022 |
ELECTRIC - CONSTRUCTION POWER |
|
Not ready for Inspection |
NR, cancelled by Contractor |
| 01/04/2022 |
ELECTRIC - CONSTRUCTION POWER |
|
Denied |
Denied, required clearance at disconnect panel. (existing temp panel addressed 4610 S. Landing Way, Lot 35, Temp) |