Status:
In Review
Type:
Commercial Building
Apply Date:
07/28/2021
Applicant:
CHRIS HODGSON
Description:
New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect

Permit Reviews

Permit Number - T21CM06128
Permit Status: In review
Permit Description: New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect
Start Date Submittal Complete Date Status  
07/28/2021 3RD PARTY REVIEW - COMMERCIAL 09/20/2021 COMPLETED Review Details
09/20/2021 RESUBMITTAL 09/30/2021 COMPLETED Review Details
03/28/2023 COMMERCIAL REVIEW - FULL v.1 05/04/2023 APPROVED Review Details
08/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/22/2023 APPROVED Review Details
07/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2023 APPROVED Review Details
10/06/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2023 REQUIRES RESUBMIT Review Details
08/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/28/2023 APPROVED Review Details
01/20/2023 COMMERCIAL REVIEW - FULL v.1 02/08/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM06128
Permit Status: In review
Permit Description: New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect
Total Outstanding Activity Conditions - 1
Date Name
02/02/2023 A final elevation certificate is required before final inspection

Conditions

Permit Number - T21CM06128
Permit Status: In review
Permit Description: New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect
Date Description Comments
09/24/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/24/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
09/24/2021 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
09/24/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/24/2021 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/24/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/24/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
09/29/2021 SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
09/29/2021 FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
09/24/2021 SHOP DRAWINGS REQUIRED FOR PREFABRICATE METAL BUILDING
09/24/2021 SHOP DRAWINGS REQUIRED FOR STEEL TRUSSES
09/24/2021 SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL.
09/29/2021 FUP T21OT00712 MUST BE PAID BEFORE FINAL INSPECTIONS.
09/29/2021 FUP T21OT00712 MUST BE PAID BEFORE FINAL INSPECTIONS.

Outstanding Inspections

Permit Status: In Review
Permit Number: T21CM06128
Permite Description: New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCME - Kitchen Hood N/A Not Ready
01/04/2023 COT - LCBU - Building Progress N/A Partial Pass Pre-C of O walk through inspection.
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
03/07/2023 COT - LCEL - Electrical Underground N/A Partial Pass 3/7/23. Light pole base furthest west okay to pour concrete 20' of coil copper line with rebar per plan
10/26/2022 COT - LCEL - Electrical Progress N/A Not Ready
03/28/2023 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass UG Plumbing
07/27/2023 COT - FCON - Alarm - Final N/A Partial Pass Need to add a horn/strobe in outside bar.
07/27/2023 COT - FCON - Sprinkler - Final N/A Partial Pass North and east patio 5-6 heads are blocked by electrical conduit or lighting fixtures, Roll up door on north side of restaurant no coverage under door when open, bag covering head above bar.
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
08/21/2023 ENGR Engineering Final N/A Partial Pass

Completed Inspections

Permit Status: In Review
Permit Number: T21CM06128
Permit Description: New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect
Total Completed Inspections - 39
Date Description Inspector Results Comments
11/12/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 11/12/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ufers are in place}
11/29/2021 COT - LCPL - Sewer Passed {Activity date: 11/29/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover progress areas.}
12/01/2021 COT - LCPL - Yard Water Line Passed {Activity date: 12/01/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Domestic water line (PVC 1 1/4” line). Ok to cover progress areas.}
04/13/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 04/13/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
04/13/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 04/13/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to insulate and cover walls.}
10/05/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 10/05/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to tape throughout.

}
11/21/2022 COT - LCEL - Electrical Above Ceiling Passed Canned lighting system in kitchen and food prep areas
03/08/2023 COT - LCPL - Plumbing Progress Passed Gas piping.
03/30/2023 BULD - Electrical Clearance Passed Approved 1000A service, ECO Clearance to TEP is required
04/28/2023 COT - LCBU - Stem Wall/Retaining Wall Passed
04/28/2023 COT - LCPL - Rough Soil Passed
04/28/2023 COT - LCME - Mechanical Final Passed
04/28/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
04/28/2023 COT - LCBU - Framing Passed
04/28/2023 COT - LCEL - Electrical Underground Passed
04/28/2023 COT - LCEL - Electrical Progress Passed
06/29/2023 COT - LCBU - Roof Nailing Passed
06/29/2023 COT - LCBU - Exterior Clips/Sheathing Passed
06/29/2023 COT - LCBU - Sustainability Passed
06/29/2023 COT - LCPL - Gas Pressure Test Passed
06/29/2023 COT - HCBU - Exterior Clips/Sheathing Passed
06/29/2023 COT - LCPL - Plumbing Above Ceiling Passed
06/29/2023 COT - LCPL - Medical Gas Preconstruction Mtg Passed
06/29/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/29/2023 COT - LCBU - Masonry Pregrout Passed
06/29/2023 COT - LCME - Mechanical Above Ceiling Passed
06/29/2023 COT - LCBU - Preslab Passed
06/30/2023 COT - LCBU - Building Above Ceiling Passed
06/30/2023 COT - LCEL - Construction Power Passed
07/19/2023 COT - LCME - Mechanical Progress Passed
07/19/2023 COT - LCME - Mechanical Intermediate Passed
07/19/2023 COT - LCEL - Outdoor Lighting Passed
07/19/2023 COT - LCEL - Electrical Final Passed
07/19/2023 COT - LCPL - Plumbing Final Passed
07/27/2023 COT - FCON - Hood System - Final Passed
08/15/2023 COT - FCON - Alarm - Final Passed
08/15/2023 COT - FCON - Sprinkler - Final Passed
08/21/2023 COT - HCBU - Building Final Passed Passed pending Fire and engineer finals
08/23/2023 ENGR Engineering Final Passed GOOD FOR C.O

Documents

File Name Document Type  
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
PERMIT_20230818_V1.PDF DOCUMENTS VIEW
29.21.1419 SAECO CORBETT BLOCK PHASE 1 FINAL REPORT1-2023-07-20_V1.PDF DOCUMENTS VIEW
LOVE BURGER (CHLORINATION REPORT)-2023-07-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONTRACTOR IDENTIFICATION LETTER - CORBETT PROJECTS 2022-06-22 - UPLOADED FILE TYPE OTHER; OTHER 1; 1 (1).PDF DOCUMENTS VIEW
NOTICE OF CONTRACTOR CHANGE TO SUNDT 2022-06-22 - UPLOADED FILE TYPE OTHER; OTHER 1; 1 (1).PDF DOCUMENTS VIEW
COT PERMIT REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
CONS-4_REVISED PLAN SHEETS_V1.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLANSET_V1.PDF DOCUMENTS VIEW
COT PERMIT REVISION - CHANGE OF ADDRESS - BUILDING 2_V1.PDF DOCUMENTS VIEW
CONS-22095-SUBMITTAL-1-23-2023_V2.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEOTECHINCAL REPORT.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
STRUCT CALCS.PDF DOCUMENTS VIEW
STANTEC PSA.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW