Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCEL - Electrical Underground |
|
Not Ready |
|
| 05/10/2022 |
COT - LCEL - Electrical Underground |
JBURGE |
Partial Approval |
Entered by NGARCIA3 - . Partial. Electric conduits (1” and 3/4” lines) for 8 pole lights. Ok to cover progress areas. |
| 05/09/2022 |
COT - LCEL - Electrical Underground |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 01/06/2022 |
COT - LCEL - Electrical Underground |
JBURGE |
Partial Approval |
Entered by NGARCIA3 - Partial. Three each secondary conduit lines (3”) from building to future transformer site; approximately 150’. Ok to cover progress areas. Communication lines: 2 each at 2 1/2”from building to North power pole. Ok to cover progress areas. |
| 01/05/2022 |
COT - LCEL - Electrical Underground |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - AP canceled |
| 12/16/2021 |
COT - LCEL - Electrical Underground |
ESTEVENS |
Partial Approval |
Entered by VVERA1 - Partial. From the SES location to 10 feet out from the building. |
| 11/12/2021 |
COT - LCEL - Electrical Underground |
JBURGE |
Approved |
Entered by VVERA1 - Approved. Primary electric conduits are in place.
|
| 11/02/2021 |
COT - LCEL - Electrical Underground |
ESTEVENS |
Partial Approval |
Entered by NGARCIA3 - Partial. Data and communication lines, power lines from SES to interior electrical service panels. |
| 02/28/2023 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
4 of 7 light pole basis. Rebar per plan 20’ coil copper line in place, okay for concrete. |
| 03/07/2023 |
COT - LCEL - Electrical Underground |
|
Partial Pass |
3/7/23. Light pole base furthest west okay to pour concrete 20' of coil copper line with rebar per plan |
| 03/30/2023 |
COT - LCEL - Electrical Underground |
|
Canceled |
|
| 04/28/2023 |
COT - LCEL - Electrical Underground |
|
Passed |
|