Permit: T21CM05961
Permit Details
Apply Date:
07/22/2021
Applicant:
Description:
Replace the entire recently completed building remodel and interior T.I. for the Family Dollar Store
Permit Reviews
Permit Number - T21CM05961
Permit Status: Complete
Permit Description: Replace the entire recently completed building remodel and interior T.I. for the Family Dollar Store
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/22/2021 | 3RD PARTY REVIEW - COMMERCIAL TI | 11/29/2021 | COMPLETED |
12/02/2021 | REVISION - - 1ST | 01/19/2022 | COMPLETED |
01/24/2023 | COMMERCIAL REVIEW - FULL v.2 | 01/30/2023 | APPROVED |
11/17/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/16/2022 | REQUIRES RESUBMIT |
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/15/2023 | APPROVED |
Conditions
Permit Number - T21CM05961
Permit Status: Complete
Permit Description: Replace the entire recently completed building remodel and interior T.I. for the Family Dollar Store
Date | Description | Comments |
---|---|---|
08/30/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
08/30/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
08/30/2021 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
08/30/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/30/2021 | SPECIAL INSPECTION IS REQUIRED FOR MASONRY |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM05961
Permite Description: Replace the entire recently completed building remodel and interior T.I. for the Family Dollar Store
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCBU - Masonry Pregrout | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
01/10/2023 | COT - LCBU - Framing | N/A | Partial Pass | North and West entry areas canopy. |
03/15/2023 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable | |
06/29/2023 | BULD - Electrical Clearance | N/A | Canceled | |
06/29/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM05961
Permit Description: Replace the entire recently completed building remodel and interior T.I. for the Family Dollar Store
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/13/2022 | COT - LCBU - Roof Nailing | Passed | ||
12/13/2022 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
02/06/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | Ok to cover exterior walls | |
02/06/2023 | COT - HCBU - Interior Shear Bracing | Passed | Interior framing is complete. Ok to insulate exterior walls. | |
02/21/2023 | COT - LCEL - Electrical Intermediate | Passed | Electric in office walls and interior walls is completed. Ok to insulate progress areas. | |
03/15/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
03/15/2023 | COT - LCBU - Preslab | Passed | ||
03/15/2023 | COT - LCBU - Framing | Passed | ||
03/15/2023 | COT - LCPL - Rough Soil | Passed | ||
03/15/2023 | COT - LCPL - Sewer | Passed | ||
07/12/2023 | COT - HCBU - Masonry Pregrout | Passed | ||
05/02/2023 | COT - LCPL - Plumbing Progress | Passed | ||
05/02/2023 | COT - LCEL - Electrical Underground | Passed | ||
05/05/2023 | COT - LCEL - Electrical Above Ceiling | Passed | Mechanical and electrical rough-in is complete above ceiling. Okay to install ceiling tiles. | |
05/05/2023 | COT - LCME - Mechanical Above Ceiling | Passed | Mechanical and electrical rough-in is complete above ceiling. Okay to install ceiling tiles. | |
05/05/2023 | COT - LCBU - Building Above Ceiling | Passed | Mechanical and electrical rough-in is complete above ceiling. Okay to install ceiling tiles. | |
05/05/2023 | COT - LCEL - Grounding/Bonding | Passed | Grounding and bonding is in place for electrical panels and transformers. | |
05/05/2023 | COT - LCPL - Plumbing Roof Drains | Passed | Roof drains are installed. | |
05/05/2023 | COT - LCME - Mechanical Intermediate | Passed | All mechanical rough-in is complete. Okay to install ceiling tiles in grid ceiling. | |
06/23/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
08/07/2023 | COT - LCEL - Electrical Final | Passed | ||
08/07/2023 | COT - LCEL - Service Upgrade | Passed | ||
08/07/2023 | COT - LCPL - Plumbing Final | Passed | ||
08/07/2023 | COT - LCME - Mechanical Final | Passed | ||
08/07/2023 | COT - LCBU - Building Final | Passed | ||
08/07/2023 | COT - FCON - Fire - Final | Passed |