Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Masonry Pregrout
Permit Number - T21CM05961
Inspection Description - COT - LCBU - Masonry Pregrout
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCBU - Masonry Pregrout | Not Ready | ||
10/20/2022 | COT - LCBU - Masonry Pregrout | JBURGE | Partial Approval | Entered by NGARCIA3 - Partial. Unit #121; CMU wall at second lift (4’ - 8’): North wall, West wall, South and Southwest wall. Arches area at 0’ - 4’. Ok to place grout in progress areas. |
10/05/2022 | COT - LCBU - Masonry Pregrout | SCARRAZCO | Partial Approval | Entered by VVERA1 - Partial. Demising wall between suite 111 and 121. Breaking point between suite 121 and 151. Owners office suite. First lift for perimeter CMU wall is okay to grout. |
09/30/2022 | COT - LCBU - Masonry Pregrout | TGAUSP | Partial Approval | Entered by RSALDAT1 - Partial approval for stem walls at units 121 and 151 (west) and 151 (south) and 151 (east) and demising wall between unit 111 and 121, okay for concrete placement |
10/28/2022 | COT - LCBU - Masonry Pregrout | Partial Pass |