Permit: T21CM04992
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
45 W LALO WY
Address NEW:
45 W LALO WY
Apply Date:
06/15/2021
Applicant:
Dan Kishinami
Description:
New Townhome
Permit Reviews
Permit Number - T21CM04992
Permit Status: Inspections
Permit Description: New Townhome
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2021 | 3RD PARTY REVIEW - RESIDENTIAL | 08/04/2021 | COMPLETED |
| 08/19/2021 | RESUBMITTAL | 10/04/2021 | COMPLETED |
| 01/29/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/30/2026 | REQUIRES RESUBMIT |
| 11/19/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/24/2025 | APPROVED |
| 06/29/2026 | SPECIAL INSPECTION REVIEW v.1 | 06/30/2026 | APPROVED |
| 05/21/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 05/21/2026 | APPROVED |
| 02/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 02/12/2026 | REQUIRES RESUBMIT |
| 12/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/31/2025 | REQUIRES RESUBMIT |
| 04/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/01/2023 | APPROVED |
Conditions
Permit Number - T21CM04992
Permit Status: Inspections
Permit Description: New Townhome
| Date | Description | Comments |
|---|---|---|
| 08/04/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 08/04/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR COMCRETE COMPRESSIVE STRENGTH | |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR RE-BAR | |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR SOILS EXCAVATION | |
| 08/04/2021 | SPECIAL INSPECTION IS REQUIRED FOR MORTAR AND GROUT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T21CM04992
Permite Description: New Townhome
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | Inspection Canceled |
| 09/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Interior framing system. |
| 08/07/2026 | RSBU - Building Final | N/A | Re-inspection required | Unit 45. Provide GFCI receptacle between fridge and sink. Hallway less than 36” at second floor. Provide shackle lock for water heater breaker. 2nd floor light not in Place. Ensure dryer vents do not have screens. |
| 12/02/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 12/2/25: Arc-fault required at smoke detectors and laundry room, patch work required at exterior throughout, properly terminate condensate drain with 90 degree fitting, lights not working throughout, roof drain is missing guard at 3rd floor, stair lighting not functioning, water closet requires 15" clearance on both sides, GFCI required in laundry rooms, seal penetrations around duct in mechanical room, lock out required at water heater, secure electrical whip at air handler, leak at refrigerator area from next door unit must be opened and addressed, no power at exterior receptacles, appliances must be installed, kitchen exhaust must be installed, |
| 12/02/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 12/2/25: Arc-fault required at smoke detectors and laundry room, patch work required at exterior throughout, properly terminate condensate drain with 90 degree fitting, lights not working throughout, roof drain is missing guard at 3rd floor, stair lighting not functioning, water closet requires 15" clearance on both sides, GFCI required in laundry rooms, seal penetrations around duct in mechanical room, lock out required at water heater, secure electrical whip at air handler, leak at refrigerator area from next door unit must be opened and addressed, no power at exterior receptacles, appliances must be installed, kitchen exhaust must be installed, |
| 08/07/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 08/03/2023 | COT - RSEL - Electrical Underground | N/A | Partial Pass | 8/3/23: wanted to call building progress to renew permit |
Completed Inspections
Permit Status: Inspections
Permit Number: T21CM04992
Permit Description: New Townhome
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2023 | RSBU - Building Progress | Passed | 8/3/23: wanted to call building progress to renew permit | |
| 09/24/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | OK to cover exterior walls. | |
| 09/24/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system | |
| 10/15/2024 | RSME - Mechanical Progress | Passed | ||
| 10/15/2024 | RSPL - Plumbing Progress | Passed | ||
| 10/31/2024 | RSEL - Electrical Progress | Passed | ||
| 02/24/2026 | COT - RSEL - Electrical Final | Passed | NOTE: Unable to move toilet to meet ADA standards as a structural beam is located beneath area in question: cannot cut beam to allow the toilet to be moved. The location of the toilet will be accepted as correct for this structure. | |
| 08/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/07/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 08/07/2026 | COT - RSEL - Electrical Underground | Passed |